首页> 外国专利> On-site construction of continuous pavement, involves arranging series of empty molds filled with traditionally compatible or non-compatible material

On-site construction of continuous pavement, involves arranging series of empty molds filled with traditionally compatible or non-compatible material

机译:连续路面的现场施工包括安排一系列填充有传统相容性或非相容性材料的空模具

摘要

A series of empty molds for development of pavement is arranged. The molds are to be filled with traditionally compatible or non-compatible materials.
机译:安排了一系列用于开发路面的空模具。模具应填充传统上兼容或不兼容的材料。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号