Reach to the underground waters metal welding ground embedding construction method and the carbon welding ground formation embedding construction method
Reach to the underground waters metal welding ground embedding construction method and the carbon welding ground formation embedding construction method
展开▼
机译:达到地下水金属焊接地面埋设施工方法和碳焊接地面形成埋设施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To reduce ground-potential difference while improving workability by burying a metallic earth and a carbon-rod into an underground deep layer reaching a groundwater area. ;SOLUTION: A pit 9 from a ground surface to a groundwater area is bored, the lower end of a metallic earth 8 is hung down vertically until it reaches the bottom section of the pit 9, and backfilling is conducted by a coarse gravel layer 2, a fine gravel layer 3 and a sand layer 4 from the bottom of the pit. A section from the half of the upper section of the pit 9 to one third is filled with carbon in response to the changes of geology and a stratum, a carbon layer 5 is formed by rolling compaction and used as the carbon-rod earth 1, and the metallic earth 8 is exposed in a candle-wick shape and connected to a building or laid on the ground surface. Carbon is mixed with surface soil 6 from 30 cm from the ground surface to 60 cm, the upper end of the carbon-rod earth 1 is brought into contact, the upper end section of the metallic earth 8 is brought into contact sufficiently with surface soil 6 by radially diffusing and laying the upper end section of the metallic earth 8. Accordingly, since a large amount of minus ions are discharged to the ground surface, soil is improved naturally while human living environment can be enhanced.;COPYRIGHT: (C)2000,JPO
展开▼