首页> 外国专利> Movement stage for tunnel reconstruction and the tunnel reconstruction manner null which uses

Movement stage for tunnel reconstruction and the tunnel reconstruction manner null which uses

机译:隧道改造的运动阶段及采用的隧道改造方式

摘要

PROBLEM TO BE SOLVED: To secure smooth passage of trains while using the entire railways during suspension time except during execution time of the repair work althrough use of the railways in an existing tunne 1 is regulated during the repair work. ;SOLUTION: This transfer stage for repairing a tunnel is a stage which is transferable along the longitudinal direction of the tunneland is constituted of a working floor 30 and studs 31A, 31B provided at both lower face sides of the working floor 30. All the studs 31A, 31B disposed at both sides are made freely transferable in the width direction of the tunnel respectively, and a part 40A of the working floor is made so as to rise and fall for bring in and out execution machines.;COPYRIGHT: (C)2000,JPO
机译:要解决的问题:在维修期间,为了确保火车在通行期间在整个铁路上的顺利通过,除了在维修工作的执行期间外,通过在现有隧道中使用现有隧道1中的铁路来进行调节。 ;解决方案:该用于修复隧道的转移阶段是沿着隧道的纵向方向可转移的阶段,并且由工作地板30和设置在工作地板30的两个下表面侧的双头螺栓31A,31B组成。设置在两侧的31A,31B可分别在隧道的宽度方向上自由移动,并且使工作地板的一部分40A可升降,以用于带入和带出执行机。版权所有:(C) 2000年

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号