The Dragon's Breath End To End Thermal Loop System's highest and best use is for commercial power plants but it's range is from 60 KW to 420 MW making it's use to industry to fill every need. ;This system can be sized to replace all diesel engines and possibly the internal combustion gas engine as well. Diesel trucks could easily be converted with the aid of a 1 MW turbine. Diesel electric trains would use 3 MW system maximum out put today is 1 MW. The reason for the extra power is all switch engines used by the railroads sit idle 85% of the time if they were to change to 3 MW turbines and plugged into the grid. It would be the same as building 10 new power plants in the USA.
展开▼