首页> 外国专利> Method for simulating project duration and costs

Method for simulating project duration and costs

机译:模拟项目工期和成本的方法

摘要

The inventive method for simulating project costs and duration of a project with a set of interdependent tasks comprises the steps of:determining task duration probability distributions;performing different realizations of possible scenarios with different task durations, determining both total project duration and aggregated liquidation damages of penalties defined by task duration penalty functions; andconsolidating and displaying the results of all realizations.;The method can be used in a project-planning phase as well as in a project-tracking phase with dynamically updated actual task durations.
机译:用于模拟具有一组相互依赖的任务的项目的成本和工期的创造性方法包括以下步骤: 确定任务工期概率分布; 对具有不同任务工期的可能方案进行不同的实现,确定项目总工期和累计清算损失任务持续时间惩罚函数定义的惩罚; ;该方法可用于项目计划阶段以及动态跟踪实际情况的项目跟踪阶段任务持续时间。

著录项

  • 公开/公告号EP1355245A1

    专利类型

  • 公开/公告日2003-10-22

    原文格式PDF

  • 申请/专利权人 ABB RESEARCH LTD.;

    申请/专利号EP20020405301

  • 申请日2002-04-15

  • 分类号G06F17/60;

  • 国家 EP

  • 入库时间 2022-08-21 23:48:46

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号