首页> 外国专利> MAIN COLUMN MEMBER OF STEEL PIPE TOWER FILLED WITH CONCRETE, AND CONSTRUCTION METHOD FOR STEEL PIPE TOWER

MAIN COLUMN MEMBER OF STEEL PIPE TOWER FILLED WITH CONCRETE, AND CONSTRUCTION METHOD FOR STEEL PIPE TOWER

机译:钢管混凝土塔的主要构件及其施工方法

摘要

PROBLEM TO BE SOLVED: To provide main column members of a steel pipe tower filled with concrete having a high workability at a low cost, and a construction method for steel pipe tower filled with concrete.;SOLUTION: Hollow steel pipes are connected together in up-down direction, and a connected body 3 of the hollow steel pipes is assembled. A filler 5 is placed under pressure at a low speed from a filler inlet 7 to near a bottom end portion of a preliminary mortar filler inlet 8 where the top of filled mortar is located. Placing of the filler 5 is interrupted, and a predetermined amount of preliminary mortar 6 first is poured above the top position of the filler 5 from the mortar filler inlet 8. A top hoper 16 is installed to the highest portion of the connected body 3 of the hollow steel piles, and the filler 5 is poured again under pressure until the top end portion reaches near an intermediate portion of the top hoper 16. Upon completion of pouring the filler 5 under pressure, surplus filler 5 remaining in the top hopper 16 is discarded when sedimentation is completed before the hardening of the filler 5, then the top hopper 16 is removed and the top surface of the connected body 3 of the hollow steel pipes is leveled.;COPYRIGHT: (C)2004,JPO
机译:解决的问题:以低成本提供高可操作性的填充有混凝土的钢管塔的主柱构件,以及填充有混凝土的钢管塔的施工方法。;解决方案:空心钢管被连接在一起。上下方向组装空心管的连接体3。从填充剂入口7到填充砂浆顶部所在的初步灰浆填充剂入口8的底端部分附近以低速将填充剂5置于压力下。填充剂5的放置被中断,并且首先从灰浆填充剂入口8在填充剂5的顶部位置上方倒入预定量的初级灰浆6。顶部希望器16被安装到连接体3的最高部分。然后,在压力下再次注入填充料5,直到顶端部分到达顶部希望料斗16的中间部分附近。在压力下注入填充料5后,剩余的填充料5留在顶部料斗16中。在填料5硬化之前沉淀完成后将其丢弃,然后移除顶部料斗16并将中空钢管的连接体3的顶表面弄平。版权所有:(C)2004,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号