首页> 外国专利> A METHOD AND DEVICE FOR REGULATING THE FLOW RATE OF FORMATION FLUIDS PRODUCED BY AN OIL WELL

A METHOD AND DEVICE FOR REGULATING THE FLOW RATE OF FORMATION FLUIDS PRODUCED BY AN OIL WELL

机译:调节油井生产液流速率的方法和装置

摘要

1. A method of regulating the flow rate of formation fluids produced from a determined zone of an underground well whose cased wall is provided with orifices through which said formation fluids can pass, said method consisting in applying a tubular structure along the casing in said zone, which tubular structure prevents the fluids from flowing directly while also preserving a flow path along which the fluids can flow via the annular space outside the tubular structure so as to generate head loss. 2. A method according to claim 1, in which said path is helical. 3. A device for regulating the flow rate of formation fluids produced from a determined zone of an underground well whose wall is cased with casing provided with perforation orifices to allow said formation fluids to pass through it, said device being constituted by a radially-expandable tubular structure that can be applied against the inside wall of the casing, the structure being provided with means for preserving the flow of the fluids via a path running along the casing and along the structure, in order to generate head loss. 4. A device according to claim 3, characterized in that said flow means are constituted by removal grooves extending from the central portion of the outside face of the tubular structure to at least one of the ends of the tubular structure. 5. A device according to claim 4, characterized in that said removal grooves are disposed helically. 6. A device according to claim 4, characterized in that said removal grooves are disposed in the form of zigzag lines. 7. A device according to any one of claims 3 to 6, in which, in its central portion serving to cover the perforation zone, the tubular sleeve is provided with draining grooves for collecting the incoming flow. 8. A device according to any one of claims 3 to 7, in which the tubular sleeve is constituted by a braid of flexible strands embedded in a settable composite material, and, on its outside face, it has an elastomer skin in which the removal and drainage grooves are provided. 9. A method for putting the device according to claim 8 in place in a well equipped with casing and with production tubing, said method comprising: - inserting a laying tool via the casing, which tool comprises an inflatable die provided with heater elements and covered with the tubular sleeve, which die is suspended from a cable containing electricity feed means and pumping means; - inflating the die until the sleeve is applied against the inside wall of the casing; - heating the die to polymerize the settable composite material; - deflating the die while leaving the sleeve in place; and removing the laying tool from the well.
机译:1.一种调节从地下井的确定区域产生的地层流体的流量的方法,所述地下井的套管壁上设有孔,所述地层流体可以通过所述孔,所述方法包括在所述区域中沿着套管施加管状结构。这种管状结构防止流体直接流动,同时还保留了一条流动路径,流体可以沿着该流动路径通过管状结构外部的环形空间流动,从而产生水头损失。 2.根据权利要求1所述的方法,其中,所述路径是螺旋形的。 3.一种用于调节从地下井的确定区域中产生的地层流体的流量的装置,该地下井的壁装有带穿孔的套管的套管,以允许所述地层流体通过,所述装置由可径向膨胀的装置构成。可以被施加到壳体的内壁上的管状结构,该结构设有用于通过沿着壳体和沿着该结构延伸的路径来保持流体的流动的装置,以产生水头损失。 4.根据权利要求3所述的装置,其特征在于,所述流动装置由从所述管状结构的外表面的中心部分延伸到所述管状结构的至少一个端部的去除槽构成。 5.根据权利要求4所述的装置,其特征在于,所述移除凹槽以螺旋方式设置。 6.根据权利要求4所述的装置,其特征在于,所述去除凹槽以之字形线的形式设置。 7.根据权利要求3至6中任一项所述的装置,其中,所述管状套筒在其用于覆盖所述穿孔区域的中心部分中设置有用于收集进入的流的排泄槽。 8.根据权利要求3至7中的任一项所述的装置,其中,所述管状套筒由嵌入可凝固的复合材料中的柔性股线的编织物构成,并且所述管状套筒在其外表面上具有弹性体表皮,在所述弹性体表皮中,可去除所述弹性体表皮。并设有排水槽。 9.一种将根据权利要求8所述的装置放置在装备有套管和生产管的井中的方法,所述方法包括:-经由所述套管插入铺设工具,所述工具包括设置有加热器元件并且被覆盖的可膨胀模具。带有管状套筒,该模具悬挂在装有供电装置和泵送装置的电缆上; -给模具充气,直到将套筒套在壳体的内壁上; -加热模具以聚合可固化的复合材料; -放空模具,同时将套筒留在原处;并从井中卸下铺设工具。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号