首页> 外国专利> SYSTEM AND METHOD FOR SCHEDULING AND SEQUENCING SUPPLY CHAIN RESOURCES

SYSTEM AND METHOD FOR SCHEDULING AND SEQUENCING SUPPLY CHAIN RESOURCES

机译:供应链资源排序和排序的系统和方法

摘要

The process (100) beings at step (102) when a static model of the operating environment is loaded and/or created. The static model is modeled by defining or loading certain input data, for example, horizon information, SKU constraints scheduled receipts, bill of material, and initial assignments. At step (104), initial assignments are placed and materials are allocated accordingly. Before the sequencing system makes plans for fulfilling any not yet planned order, it may plan for orders with pre-defined assignments during the initialization step (104). At step (106), the system created a temporary table of unplanned orders. At step (112), each order is prioritized in the window. Those orders with higher priority will generally be scheduled before those that have lower priority. At step (114), the highest prioritized order not yet planned is selected and the order planned.
机译:当加载和/或创建操作环境的静态模型时,过程(100)在步骤(102)。通过定义或加载某些输入数据来建模静态模型,例如,范围信息,SKU约束,计划收货,物料清单和初始分配。在步骤(104),放置初始分配,并相应地分配材料。在排序系统制定计划以完成尚未计划的订单之前,它可以在初始化步骤(104)中计划具有预定义分配的订单。在步骤(106),系统创建了计划外订单的临时表。在步骤(112),在窗口中对每个订单进行优先排序。优先级较高的订单通常会排在优先级较低的订单之前。在步骤(114),选择尚未计划的最高优先顺序并计划该顺序。

著录项

  • 公开/公告号AU2003228859A1

    专利类型

  • 公开/公告日2003-11-17

    原文格式PDF

  • 申请/专利权人 MANUGISTICS INC.;

    申请/专利号AU20030228859

  • 申请日2003-05-05

  • 分类号G06F19/00;

  • 国家 AU

  • 入库时间 2022-08-21 23:03:35

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号