PURPOSE: A slope reinforcement method is provided to increase shear strength by pressurizing on an irregular slope using a high-tension and high-elasticity compression net, and to cut down the construction expenses by reducing the required number of a lock bolt or a soil nailing. CONSTITUTION: The slope reinforcement method comprises the steps of: placing a main stiffener on the slope, then fixing by attaching a pressure plate; arranging roll-type wire nets(10) on the slope; binding up the wire net(10) to the main stiffener installed on the top of the slope, then tensioning downward and binding to the main stiffener and tensioning to the right and left and binding up the right and left of the wire net(10) to the main stiffener, and binding up the right and left of the steel wire(10) using a connecting hook according to the width of the slope; and placing a main stiffener and an auxiliary stiffener to a part where a wire net(10) gets loose, then adhering the steel wire(10) and the slope closely.
展开▼