首页>
外国专利>
ASPHALT JOINT SINKING PREVENTION APPARATUS OF L-TYPE DRAINAGE USING FIBERGLASS REINFORCED PLASTICS
ASPHALT JOINT SINKING PREVENTION APPARATUS OF L-TYPE DRAINAGE USING FIBERGLASS REINFORCED PLASTICS
展开▼
机译:玻纤增强塑料对L型排水的沥青联合沉降预防装置
展开▼
页面导航
摘要
著录项
相似文献
摘要
The subject innovation is F. Al. Blood (FRP) El road using the panel and (L) type on the gutter asphalt connection preventing settlement facility, in particular road El F on the side face of the (L) type gutter. Al. Subsidence consisting of blood panel F. securing the room district as an anchor to prevent El (L) type gutter with water higher salaries developer to the connection of the asphalt that subsidence caused by the vehicle occurs, and to enable a smooth drainage treatment of the road surface. al. blood (FRP ) road El (L) type asphalt gutter connection with the anti-settlement panel it relates to the facility.; According to the present invention is a roadway boundary stone is installed El (L) type gutter to the top of the tosacheung, install the roadway boundary stone in the upper portion, the connection portion of the side surface is constructed by placing a layer of sand, rubble layer, asphalt layer, wherein roadway boundary stone 600, El (L) is provided on the upper portion of the type gutter, the sand layer 200, the connection portion of the side surface portion, the rubble layer 300, and asphalt (400) layer is a driveway 700, laminated in this order are There is formed, and, that the depression chamber region (900) fixed to the anchor 950 to include side El (L) type gutter 500 of the installation extends in the longitudinal direction, the depression room Earth 900, the whole El consists of a type (L) form, its top is formed with a plurality of aggregate 910 as protrusions, and the upper side with a plurality of drain holes 930 is formed on its side with a plurality in the vertical portion of anchor hole 940 is formed, the depression chamber region (900) is configured as a longitudinal direction on both sides coming Other settlement room F. for showing the process of manufacturing the connecting portion 920 has a stepped to be connected to the earth formation. Al. Provides a road asphalt elhyeong gutter connecting portions prevent settlement facility with the blood panel.
展开▼