首页> 外国专利> PROCESS OF ERECTION OF WATER-DEVELOPMENT WORKS ON SHOAL SECTION OF WATER AREA

PROCESS OF ERECTION OF WATER-DEVELOPMENT WORKS ON SHOAL SECTION OF WATER AREA

机译:在水域浅滩部分架设水利工程的过程

摘要

FIELD: erection of permanent water-development works. SUBSTANCE: invention is related to erection of permanent water-development works in process of development and construction of shoal sections of water area, for instance, during excavation and deep processing of hydrocarbon raw materials, during construction of fish-breeding complexes, artificial islands, in particular. Floating reinforced concrete matrix pontoon fitted with plant preparing concrete solution and attachments for casting and mounting of piles, loaded with piles in the form of pipes is towed to site of erection of water-development works. Pipes are positioned vertically along two sides of reinforced concrete matrix pontoon in symmetry with its longitudinal axis. Concrete mixture is poured into spaces of pipes. Matrix pontoon is moved to new site and next group of piles is put along its two sides till formation of pile field is completed. Then base pontoons which width is equal to width of matrix pontoon are in turn brought into intervals between piles and each pontoon is made fast to piles bordering on it. Charge ballast is loaded into each base pontoon. Later payload is formed on base pontoons by positioning of production equipment and/or formation of landscape-architectural forms. Mounted floating reinforced concrete pontoon that can be detached is attached to one of free sides of base pontoon. EFFECT: simplified assembly, reduced time and labor input to erection of water-development works, enhanced functional reliability of these structures. 2 cl, 4 dwg
机译:领域:建造永久性的水开发工程。物质:本发明涉及在水域浅滩区的开发和建设过程中,例如在烃类原料的挖掘和深加工,鱼类养殖区,人工岛的建设,特别是。漂浮的钢筋混凝土基体浮桥装有工厂准备的混凝土溶液和用于浇铸和安装桩的附件,并以管道形式装载桩,被拖到水开发工程的安装地点。管道沿钢筋混凝土浮桥的两侧垂直放置,并与纵轴对称。将混凝土混合物倒入管道空间中。矩阵浮桥被移到新的地点,然后在其两侧放置下一组桩,直到桩场的形成完成。然后将宽度等于矩阵浮桥宽度的基础浮桥置于桩之间的间隔中,并使每个浮桥都快于桩在其周围的桩。装料镇流器被加载到每个基础浮桥中。之后,有效载荷通过生产设备的定位和/或景观建筑形式的形成而在基础浮桥上形成。可以拆卸的已安装的浮动钢筋混凝土浮桥连接到基础浮桥的自由侧之一。效果:简化了装配过程,减少了安装水开发工程的时间和人力,增强了这些结构的功能可靠性。 2 cl,4 dwg

著录项

  • 公开/公告号RU2224843C2

    专利类型

  • 公开/公告日2004-02-27

    原文格式PDF

  • 申请/专利权人

    申请/专利号RU20020110978

  • 发明设计人 BOLDYREV V.S.;

    申请日2002-04-25

  • 分类号E02B17/00;

  • 国家 RU

  • 入库时间 2022-08-21 22:45:11

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号