首页>
外国专利>
EXECUTION STRUCTURE OF CIVIL ENGINEERING CUT OFF SHEET
EXECUTION STRUCTURE OF CIVIL ENGINEERING CUT OFF SHEET
展开▼
机译:土木工程图纸的执行结构
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide an execution structure of a cut off construction not loosening the sheet of a slope face bringing no damage by the front edge of a rock laying even on the steep sloped face, abutting along the substrate sufficiently even when the bottom face settles down.;SOLUTION: In an execution structure in which a civil engineering cut off sheet is laid on the surface of the substrate 1 having a sloped face 2 and the bottom face 3, a cut off sheet 6 for the sloped face in which a base cloth 4 is embedded in the cut off membrane 5 is laid on the sloped face 2. The cut off sheet 7 for the bottom face formed of only the cut off membrane 8 is laid on the bottom face 3. The base cloth 4 with the strength of 100-700 N/cm at 15-35% in elongation is used in the cut off sheet 6 for the sloped face.;COPYRIGHT: (C)2005,JPO&NCIPI
展开▼
机译:解决的问题:提供一种切除结构的执行结构,该结构不会使倾斜面的片材松动,即使在陡峭的倾斜面上,岩石的前边缘也不会造成损坏,即使在底部时也能沿基材充分邻接解决方案:在执行结构中,在具有倾斜面2和底面3的基板1的表面上放置土木工程切除片,在该执行结构中,用于倾斜面的切除片6在该斜面2上埋设有埋入有切断膜5的基布4。在底面3上埋有仅由切断膜8构成的底面用切纸7。斜面裁切纸6的拉伸强度为100-700 N / cm,伸长率为15-35%。;版权:(C)2005,JPO&NCIPI
展开▼