首页> 外国专利> STORMWATER DRAINAGE CONTROLLING DEVICE

STORMWATER DRAINAGE CONTROLLING DEVICE

机译:暴雨排水控制装置

摘要

PROBLEM TO BE SOLVED: To provide a stormwater drainage controlling device capable of ensuring sufficient reliability as the whole device even if there is in a state to lose reliability of a model while the model is used to have control over the stormwater drainage, systematically handling a hybrid control system wherein a continuous time phenomenon is intermingled with a discrete time phenomenon and eliminating a control destabilizing factor such as an occurrence of a discontinuous phenomenon or the like.;SOLUTION: When, for example, J1 is selected from among stormwater drainage controlling amount operation sections J1, J2, etc. and JT, a predetermined estimate (for example, stormwater flow) is calculated by the predictive model 13, a predetermined controlling amount (for example, the number of pump operator's seats and the number of revolutions of the pump) is calculated on the basis of the result by a control model 14. When a control selecting section 15 decides that the reliability of the operation section J1 is impaired during the operation, the selection of the operation section J1 can be immediately stopped. Each evaluation function of other operation sections J2, etc. and JT is calculated by the optimal control evaluation means 16, and the smallest value of the evaluation function is selected among of them.;COPYRIGHT: (C)2005,JPO&NCIPI
机译:要解决的问题:提供一种雨水排放控制装置,即使在模型用于控制雨水排放的状态下,即使处于丧失模型可靠性的状态下,也能够确保整个装置的足够可靠性,系统地处理雨水排放控制装置。一种混合控制系统,其中连续时间现象与离散时间现象混合在一起,并消除了控制不稳定因素,例如不连续现象的发生等;解决方案:例如,当从雨水排放控制量中选择J1时在操作部J1,J2等,JT中,通过预测模型13算出预定的估计量(例如,雨水流量),预定的控制量(例如,泵操作员的座位数,旋转数)。根据控制模型14的结果计算出泵的功率。当控制选择部分15确定可靠性时在操作过程中,如果操作部分J1的功能受损,则可以立即停止选择操作部分J1。其他操作部分J2等和JT的每个评估函数由最佳控制评估装置16计算,并在其中选择最小值。COPYRIGHT:(C)2005,JPO&NCIPI

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号