首页> 外国专利> COIL ANCHOR FOR BURYING IN BRITTLE SOIL LAYER PART AND COLLAPSE PREVENTION METHOD IN SLOPE COLLAPSE PREVENTION CONSTRUCTION

COIL ANCHOR FOR BURYING IN BRITTLE SOIL LAYER PART AND COLLAPSE PREVENTION METHOD IN SLOPE COLLAPSE PREVENTION CONSTRUCTION

机译:土层脆性地层埋土的锚固及边坡防塌施工的防塌方法。

摘要

PROBLEM TO BE SOLVED: To provide an anchor applied to a brittle soil layer formed of sediment, sand and gravel, among anchors for burying in an underground, capable of being easily advanced and preventing the agitation and plowing of the existing soil from occurring.;SOLUTION: This anchor 7 used for a brittle soil layer part is formed of a coil having an underground buried part 7a of a constant diameter of D and a constant pitch p. the coil tip 7c of the underground buried part sharpened to facilitate the advancement thereof by screwing is also put on the constant diameter D. Since a retainer for closely fitting according to the raise and fall of the earth is installed on a surface layer projected part 7b on the upper side of the underground buried part 7a and exposed to the surface of the ground, a fixing part out of a coiled shape is installed. A locking to the ground is sufficiently performed, a large extraction prevention force is generated, and a function as an anchor can be sufficiently developed also in a two layer ground with different hardnesses.;COPYRIGHT: (C)2005,JPO&NCIPI
机译:解决的问题:在埋在地下的锚中,提供一种锚固剂,该锚固剂适用于由沉积物,沙子和砾石形成的脆性土壤层,该锚固剂易于推进并防止现有土壤的搅动和耕作。解决方案:用于脆性土壤层部分的锚定件7由具有恒定直径D和恒定螺距p的地下埋入部分7a的线圈组成。另外,通过螺纹加工使地下埋入部的变尖以利于其前进的尖端7c也被放置在恒定直径D上。由于根据土壤的上升和下降而紧密配合的保持器被安装在表层突出部7b上。在地下埋入部7a的上侧且暴露于地面的状态下,安装有呈线圈状的固定部。充分地锁定到地面,产生大的防止拔出力,并且在具有不同硬度的两层地面中也可以充分发挥锚的功能。;版权所有:(C)2005,JPO&NCIPI

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号