首页>
外国专利>
Backfill method of filling method and existing constructs of existing buried cavity tube
Backfill method of filling method and existing constructs of existing buried cavity tube
展开▼
机译:充填方法的回填方法和现有地下空腔管的现有构造
展开▼
页面导航
摘要
著录项
相似文献
摘要
PPROBLEM TO BE SOLVED: To provide filler for an existing buried hollow pipe or filler for a cavity between a structure and the ground or a treatment method for an existing buried irrigation channel pipe. PSOLUTION: Filler for the existing buried hollow pipe is produced by recovering and storing minute powder soil 3 caused when washing gravel 2 sampled from a gravel pit and adhered to gravel, adding water 4 to it, and dissolving it to produce grout 1. Minute powder soil 3 adhered to gravel by washing gravel 2 sampled from the gravel pit is recovered and stored, cement or cement solidifying agent and other coagulant 5 are mixed with it, water 4 is added to it, and it is dissolved to produce grout 1. PCOPYRIGHT: (C)2006,JPO&NCIPI
展开▼