PROBLEM TO BE SOLVED: To easily make a repairing plan for preventing a large accident such as stopping operation by quickly and surely preventing the large accident such as atmospheric diffusion of toxic gas, by detecting ignition abnormality of a flare stack even in operation of a factory.;SOLUTION: A secondary side current of an exciter 1 is measured by inserting a shunt resistance 4 into an exciter secondary side lead wire. Light emission and flashing can be observed by a neon tube 6 installed in a coil 5 wound on the exciter secondary side.;COPYRIGHT: (C)2005,JPO&NCIPI
展开▼