首页>
外国专利>
The burying stand application manner in the waste final disposal field
The burying stand application manner in the waste final disposal field
展开▼
机译:垃圾最终处置场中的掩埋架应用方式
展开▼
页面导航
摘要
著录项
相似文献
摘要
Topic Furthermore, it uses for the initialization job of the breathing tube part offer of the burying stand application manner in the waste final disposal field which it tries to be able to use the tubed girder framework which initialization job of the breathing tube part, and the burying standing work of burying stand formation efficiency it is possible, well to do, over again. Solutions In order to surround the top of the existing breathing tube part 4a which is exposed in the surface of existing burying stand formation 3a, when tubed girder framework 5 is made to install, it keeps reclaiming new burying stand formation 3b with respect to existing burying stand formation. As next, you initialize new perforated stand tube 40b in existing perforated stand tube 40a in the tubed girder inside of the frame and make joint to state, entering cobblestone 41b to the tubed girder inside of the frame, it makes new breathing tube part form 4b. And, after the reclamation of new burying stand formation completes, pulling up the tubed girder framework, it pulls out, in order when this tubed girder framework is pulled out, for the top of the new breathing tube part to expose in the surface of new burying stand formation, it makes form. Choice figure Drawing 2
展开▼