首页>
外国专利>
Preceding in the fundamental crushed stone, and the application process of the oversite concrete being directly the fundamental
Preceding in the fundamental crushed stone, and the application process of the oversite concrete being directly the fundamental
展开▼
机译:首先是基础碎石,而现场混凝土的应用过程直接是基础
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a liquid leakage prevention means capable of certainly preventing a harmful substance contained in a solvent or the like used in industrial facilities from penetrating in the ground and to economically execute the liquid leakage prevention means in an execution stage for constructing the foundation of industrial facilities as a labor-saving construction method because the liquid leakage prevention means is easy to incorporate as a leaked liquid measure. ;SOLUTION: A liquid leakage prevention and cleaning apparatus is provided in a foundation ground of the spread foundation of industrial facilities. In this case, a liquid gathering trough is provided to an excavated flooring surface 3 and a leaked liquid preventing sheet 5 is laid on the excavated entire bottom surface including the liquid gathering trough and a liquid gathering pipe 6 is provided to the liquid gathering trough to be covered with broken stones.;COPYRIGHT: (C)2001,JPO
展开▼