首页> 外国专利> Repowering steam plant through addition of gas turbine and method for remodeling plant facilities

Repowering steam plant through addition of gas turbine and method for remodeling plant facilities

机译:通过增加燃气轮机为蒸汽厂提供动力的方法以及改造工厂设施的方法

摘要

A repowering steam plant through the addition of a gas turbine, and a method for remodeling the plant facilities. This repowering steam plant is constructed by, to existing steam turbine facilities, additionally installing: gas turbine facilities; a high-temperature and high-pressure water line that is provided so as to branch off from a feedwater line in the steam turbine facilities and to pass through a boiler; a branch fuel line branched off from a fuel line in the steam turbine facilities; a reformer that reforms boiler fuel from the branch fuel line by high-temperature and high-pressure water from the high-temperature and high-pressure water line; and a reformed fuel line that supplies the fuel reformed by the reformer, as gas turbine fuel, to a combustor in the gas turbine facilities.
机译:通过增加燃气轮机为蒸汽厂提供动力的方法以及改造工厂设施的方法。通过给现有的蒸汽轮机设施额外安装以下设施,可为该蒸汽轮机提供动力:燃气轮机设施;高温高压水管线,其设置为从蒸汽轮机设施中的给水管线分支并通过锅炉。从蒸汽轮机设施中的燃料管线分支出的分支燃料管线;一种重整器,通过来自高温高压水管线的高温高压水来重整来自分支燃料管线的锅炉燃料;重整燃料管线将由重整器重整的燃料作为燃气轮机燃料供应到燃气轮机设施中的燃烧室。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号