首页> 外国专利> Repowering steam plant through addition of gas turbine and method for remodelling plant facilities

Repowering steam plant through addition of gas turbine and method for remodelling plant facilities

机译:通过增加燃气轮机为蒸汽厂提供动力的方法以及改造工厂设施的方法

摘要

A repowering steam plant through the addition of a gas turbine, and a method for remodeling the plant facilities. This repowering steam plant is constructed by, to existing steam turbine facilities (100), additionally installing: gas turbine facilities (200); a high-temperature and high-pressure water line (10) that is provided so as to branch off from a feedwater line (5) in the steam turbine facilities (100) and to pass through a boiler (1); a branch fuel line (11) branched off from a fuel line (4) in the steam turbine facilities (100); a reformer (300) that reforms boiler fuel from the branch fuel line (11) by high-temperature and high-pressure water from the high-temperature and high-pressure water line (10); and a reformed fuel line that supplies the fuel reformed by the reformer (300), as gas turbine fuel, to a combustor (15) in the gas turbine facilities (200).
机译:通过增加燃气轮机为蒸汽厂提供动力的方法以及改造工厂设施的方法。通过给现有的汽轮机设施(100)额外安装燃气轮机设施(200)以及燃气轮机设施(200),来为该蒸汽轮机提供动力。高温高压水管线(10),其设置成从蒸汽轮机设备(100)中的给水管线(5)分支出并通过锅炉(1)。从蒸汽轮机设备(100)中的燃料管线(4)分支出的分支燃料管线(11);重整器(300),通过来自高温高压水管线(10)的高温高压水来重整来自分支燃料管线(11)的锅炉燃料;重整燃料管线将由重整器(300)重整的燃料作为燃气轮机燃料供给至燃气轮机设备(200)中的燃烧器(15)。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号