首页> 外国专利> PROCESS AND PLAN FOR THE OPTIMIZATION OF SCHEDULES IN IRON CHAMBER NETWORKS

PROCESS AND PLAN FOR THE OPTIMIZATION OF SCHEDULES IN IRON CHAMBER NETWORKS

机译:铁腔网络调度优化的过程和计划

摘要

The method is for the production of timetables that are optimized in respect of energy use (taking into account feedback effects) and or the time distribution of energy use (de-synchronization). If necessary further optimization parameters can be considered such as: total passenger change times, number of carriages needed and the lateness total for the considered timetables. ??Independent claims are included for: a corresponding processor arrangement; a computer program product; and a computer readable storage medium. In optimizing timetables for one or more parameters the journey curves of trains are considered.
机译:该方法用于产生时间表,该时间表针对能量使用(考虑反馈效应)和/或能量使用的时间分布(去同步)进行了优化。如有必要,可以考虑进一步的优化参数,例如:总的乘客换乘时间,所需的车厢数量以及所考虑的时间表的总延迟时间。包括独立权利要求,用于:相应的处理器装置;以及计算机程序产品;和计算机可读存储介质。在为一个或多个参数优化时间表时,应考虑列车的行驶曲线。

著录项

  • 公开/公告号PT1293948E

    专利类型

  • 公开/公告日2005-08-31

    原文格式PDF

  • 申请/专利权人 SIEMENS AKTIENGESELLSCHAFT;

    申请/专利号PT20020090328T

  • 发明设计人 ERHARD KARL-HEINZ;

    申请日2002-09-12

  • 分类号B61L27/00;

  • 国家 PT

  • 入库时间 2022-08-21 22:16:30

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号