CONNECTING SYSTEM BETWEEN DESIGN PROJECT AND SUPPLY BUSSINESS SERVICE OF VESSEL

机译:船舶设计项目与供应业务服务之间的连接系统

摘要

The invention not only to a system for managing the drawing to each department when, after the orders and more particularly vessel operating design, detailed design and production design relates to a linkage design project and procurement during ship vessel operation system different but release of drawing plans of each department drawing (drawing plan), only the design drawings for management by procurement and materials associated procurement and ship works is not it made the ship date delayed and decreased efficiency improved balsaengdoem design projects and procurement It relates to the system.; An object of the present invention is also wearing in connection with the detailed design when materials of the drawing so that information about the current status immediately as well as to be able to match the best price upon selection of the bidder, the difficulty in scheduling due to the production during Materials delay, making of ships that can avoid unnecessary increases in periods designed to provide an ecosystem of projects and procurement.; The present invention to achieve the above object, when established for scheduling in order when operating the start box and well production plan design of the vessel, and operating the design is established, also the low-level design and the addition purchase of materials according to the detailed design in ship design projects and associated systems of procurement to establish a schedule,; To generate the above detailed design the Purchase Order, the ID numbers assigned to be associated with the drawing release of drawing in each drawing plan dates, forecast dates, separated by a performance date entered in the server computer, and the purchase request is input to the one server computer When buying plane after receiving them from purchasing department sent out a quote request to vendors and receive a quote planned date in the purchase process, such as selecting vendors according to estimate, forecast date, enter a performance by date away from the planned date in the department and design department, it characterized in that it comprises that let you know it immediately.
机译:本发明不仅涉及一种用于在每个订单,特别是在船舶操作设计之后,详细的设计和生产设计涉及不同的船舶船舶操作系统期间的联动设计项目和采购的情况下向各部门管理图纸的系统,而且还发布图纸计划。在每个部门图纸(制图计划)中,仅用于采购以及与物料相关的采购和船舶工程进行管理的设计图纸,是否会延迟船期并降低效率,从而改善balsaengdoem设计项目和采购,与该系统有关。本发明的一个目的还在于与附图的材料时的详细设计相结合,以使得关于当前状态的信息立即以及能够在选择投标人时匹配最佳价格,从而难以安排时间。在“材料延误”期间的生产中,可以避免在旨在提供项目和采购生态系统的时间段内不必要的增加的船舶制造;本发明实现了上述目的,当建立用于在操作船舶的启动箱和井的生产计划设计时按顺序进行调度并且建立了该设计时,还进行了底层设计和根据材料的额外购买在船舶设计项目和相关采购系统中进行详细设计以建立时间表;为了生成上述详细设计,采购订单将在每个图纸计划日期,预测日期中分配给与图纸的图纸发布关联的ID号,并在服务器计算机中输入执行日期,然后将购买请求输入到一台服务器计算机在从采购部门收到飞机的采购飞机后,向供应商发送报价请求,并在购买过程中收到报价计划日期,例如根据估计,预测日期选择供应商,然后按日期输入性能在部门和设计部门计划的日期,其特征在于它包括让您立即知道的日期。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号