MANAGEMENT METHOD IN ORDER TO PROMOTE CORRECTNESS OF DELIVERY OF COOPERATION COMPANY WHEN VESSEL IS CONSTRUCTED
MANAGEMENT METHOD IN ORDER TO PROMOTE CORRECTNESS OF DELIVERY OF COOPERATION COMPANY WHEN VESSEL IS CONSTRUCTED
展开▼
机译:建造船舶时为了促进合作公司交付的正确性的管理方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention each node in relation to the baseline plan of the shipbuilding company when related to a management method for the delivery accuracy improved when ship outside partners, and more specifically to outside partners in the shipbuilding company delivered the materials, semi-finished products, etc. the drying vessel to prevent the delivery delay of such materials by management relates to the management methods for improved delivery accuracy of outside suppliers.; The purpose of the present invention, by the production plan of the ship s investigation to outside partners is shared with the addition Gun Ship to process the progress of outside partners to share the departments of investigation, outside partners is more than the delivery progress of the ship process detail to be able to see, shipbuilding live to be able to check each calendar etc. delivery products manufactured situation of outside partners for the delivery accuracy improvements of the ship outside partners during drying that allows you to prevent the occurrence of such tardiness reasons in advance in the management bangbeopreul provide.; Comprising the steps of: a delivery contract invention, Gun Ship Prepare a plan of production with the detailed design of the ship in order after the investigation vendor outside partners in order to achieve the above objectives,; And establish the production plan of the product delivered in accordance with the delivery contract in the above step outside partner,; Delivery Products manufactured Schedules from outside suppliers enter reference plans for each department in the server computer of the ship gun investigating delivery product production plan of the one outside suppliers to ship cases linked to the reference plan of survey, and that works here, the server inputting to the computer and,; Check the reason for the delay in the delivery schedule Shipping & Receiving and checking the contents of such materials outside partners to each department of the ship to investigate cases is characterized by the configuration as a step in preventing a delay in delivery.
展开▼