首页>
外国专利>
MANAGEMET METHOD OF TOOL FOR PRODUCTING DURING THE PROGRESS OF VESSEL'S CONSTRUCTION
MANAGEMET METHOD OF TOOL FOR PRODUCTING DURING THE PROGRESS OF VESSEL'S CONSTRUCTION
展开▼
机译:船舶建造过程中生产工具的管理方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention is subject to, and more particularly various production support equipment installations, such as such as a tool that is used in the shipbuilding process relates to a production support equipment management method of the shipbuilding process to human users pay more accurate management of the equipment should the well when you pay for each tool in the tool department at the Center relate to the quantity, production support equipment is to be one of the shipbuilding process, such as queries into management.; An object of the present invention, at Once the tool in each working group in the tool sensor dispensing as well as by to register the user to actually use the tool in the above-mentioned Working Group to the tool center, the tool usage of the whole working group in the tool center, LOST etc. It has the support of the production of the shipbuilding process one batch management enables system management methods to provide.; The present invention to achieve the above object, watercraft dispensing the tool in each working group in the work center, and the aforementioned requests to the operations center of the tool in each working group when each of the working group is configured according to the production plan of the ship drying step in the production support equipment management method of the drying process,; Characterized in that it comprises the step of substantially registration request to the tool to the discharge haegan the actual operator on the server computer of the tool center to a time to the dispensing of tools for each working group the one above, as well as the tool contact for each working group tool representative.
展开▼