首页> 外国专利> METHOD FOR PRODUCING A GAS CHAMBER air cooler gas or air cooler sections GAS PIPE cameras, gas inlet and the chamber gas outlet air cooler gas or sections of air-cooled gas MADE THIS WAY

METHOD FOR PRODUCING A GAS CHAMBER air cooler gas or air cooler sections GAS PIPE cameras, gas inlet and the chamber gas outlet air cooler gas or sections of air-cooled gas MADE THIS WAY

机译:制备气体室空气冷却器气体或空气冷却器部分的方法GAS PIPE摄像机,气体入口和室内气体出口空气冷却器气体或空气冷却的气体部分采用这种方式

摘要

1.method u0438u0437u0433u043eu0442u043eu0432u043bu0435u043du0438u00a0 duct chamber apparatus of air u043eu0445u043bu0430u0436u0434u0435u043du0438u00a0 strip or section of the air u043eu0445u043bu0430u0436u0434u0435u043du0438u00a0 gas u0445u0430u0440u0430u043au0442u0435u0440u0438u0437u0443u044eu0449u0438u0439u0441u00a0 because he u043fu0440u0435u0434u0443u0441u043cu0430u0442u0440 manufacture of metal sheet blanks of ivan u0434u043bu00a0 side, top, bottom and edge walls and at least two power u0434u043bu00a0 with u043eu0442u0432u0435u0440u0441u0442u0438u00a0 u0434u043bu00a0 passes what cutting them gas flow dividers duct cellswith the u0434u043bu00a0 side walls u0432u044bu043fu043eu043bu043du00a0u044eu0442 length corresponding to the width of the apparatus or the apparatus, it is made of u0444u0430u0441u043eu043a under with the cook, and, at least in u0434u043bu00a0 side walls forming the duct and external board camerathe blanks u0434u043bu00a0 upper and lower walls u0444u0430u0441u043au0438 u0432u044bu043fu043eu043bu043du00a0u044eu0442 unnatural configuration in cross-section with the formation of the team sites and races of welding the pipe from the technological angle u0440u0430u0441u043au0440u044bu0442u0438u00a0 41 53after u0438u0437u0433u043eu0442u043eu0432u043bu0435u043du0438u00a0 blanks u043fu0440u043eu0438u0437u0432u043eu0434u00a0u0442 consistent assembly and connection for welding the side wall with the power partitions and through them together with image u043eu0432u0430u043du0438u0435u043c integral rigid construction, which u043fu0440u0438u0441u043eu0435u0434u0438u043du00a0u044eu0442 upper and lower walls, after which one of the side walls forming the duct board, u0432u044bu043fu043eu043bu043du00a0u044eu0442 limited u0440u0441u0442u0438u00a0 under heat exchanging pipe ends, and the other side wall.at the outer board, u0432u044bu043fu043eu043bu043du00a0u044eu0442 u0441u043eu043eu0441u043du044bu0435 with u043eu0442u0432u0435u0440u0441u0442u0438u00a0u043cu0438 in duct board threaded u043eu0442u0432u0435u0440u0441u0442u0438u00a0 u0434u043bu00a0 u043eu0431u0435u0441u043fu0435u0447u0435u043du0438u00a0 opportunities u0432u0432u0435u0434u0435u043du0438u00a0 technological u0438u043du0441u0442u0440u0443u043cu0435u043du0442u043e in u0434u043bu00a0 u0437u0430u043au0440u0435u043fu043bu0435u043du0438u00a0 all pipes in the pipe board and the subsequent installation of plugs mainly for carving in u043eu0442u0432u0435u0440u0441u0442u0438u00a0u0445 external boardand in the lower and / or in the upper walls u0432u044bu043fu043eu043bu043du00a0u044eu0442 u043eu0442u0432u0435u0440u0441u0442u0438u00a0 under the connections mainly with u0444u043bu0430u043du0446u0430u043cu0438 u0434u043bu00a0 u0441u043eu0435u0434u0438u043du0435u043du0438u00a0 with the collector supply or gas drainage in silo and partitions installed in high-rise range u0441u043eu0441u0442u0430u0432u043bu00a0u044eu0449u0435u043c 1 / 4 the height of the camera, u0441u0447u0438u0442u0430u00a0 from the median horizontal plane at the height of the camera.a top side walls installed after the installation of cameras and u0437u0430u043au0440u0435u043fu043bu0435u043du0438u00a0 in duct board cameras all heat transfer tubes.;2. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the holes in the partitions u0432u044bu043fu043eu043bu043du00a0u044eu0442 to u043fu0440u0438u0441u043eu0435u0434u0438u043du0435u043du0438u00a0 to cell walls.;3. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the holes in the partitions u0432u044bu043fu043eu043bu043du00a0u044eu0442 after u043fu0440u0438u0441u043eu0435u0434u0438u043du0435u043du0438u00a0 them to the walls of the chamber.;4. way on any of the u043fu043f.2 and 3, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0, system security holes in the partitions u0432u044bu043fu043eu043bu043du00a0u044eu0442 ensuring bandwidth greater than, not less than than 5.9% of total capacity of not less than 2 / 3 of heat exchanging pipes connected with the duct board.;5. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the height of the light side wall chambers are 1.9 to 3.2 times the width in the light, walls, and top and bottom walls. ok cells with the partition set within the middle third of the height of the camera in the light.;6. method for p.1, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 so that the walls of the chamber and partitions u0434u043bu00a0 cut mainly on horizontal machines with technological u043fu0440u0438u043fu0443u0441u043au043eu043c and technology u0433u0438u0447u0435u0441u043au0438u0439 allowance in u0434u043bu00a0 side walls on each side of the width of the u0432u044bu043fu043eu043bu043du00a0u044eu0442 1.9 - 2.2 times less than on each side of the side wall.and technological u043fu0440u0438u043fu0443u0441u043au0443 equal on all sides in u0434u043bu00a0 edge walls and metal u0434u043bu00a0 partitions, which u0432u044bu043fu043eu043bu043du00a0u044eu0442 allowance on each side only) the width of the partition.;7. method for p.1, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 so that when assembling a chamber on the first side wall, u043eu0431u0440u0430u0437u0443u044eu0449u0443u044e duct board set with a time of, for example, u043fu0440u0438u0445u0432u0430u0442u043au043eu0439, u043fu0435u0440u0435u0433u043eu0440u043e dki and then set as the temporary fixation of the second side wall, u043eu0431u0440u0430u0437u0443u044eu0449u0443u044e external board chamber, after which the set technology elementsfor additional temporary fixing and the possibility of construction of u0434u043bu00a0 u043fu0440u0438u0432u0430u0440u043au0438 partitions, as well as the upper and lower walls of the chamber.;8. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the welding equipment and power dividers u043fu0440u043eu0438u0437u0432u043eu0434u00a0u0442 on technological support preferably with a heated medium the inert gas such as co2, with the subsequent clean-up welds and technological control.;9. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the holes in the side wall of the chamber are subjected to heat treatment and subsequent treatment, for example u0434u0440u043eu0431u0435u0441 u0442u0440u0443u0439u043du043eu0439 and u043fu0440u0438u0432u0430u0440u043au043eu0439 u0440u0435u043fu0435u0440u043du044bu0445 technological u043fu043bu0430u0442u0438u043au043eu0432.;10. method for p.9, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0, after u0432u044bu043fu043eu043bu043du0435u043du0438u00a0 openings in the side walls of the camera move slipway assembling apparatus of air u043eu0445u043bu0430u0436u0434u0435u043du0438u00a0 strip or on the slipway u0441u0431u043eu0440u043a the apparatus and the air u043eu0445u043bu0430u0436u0434u0435u043du0438u00a0 stripthe edge wall of the chamber and u043fu0440u043eu0438u0437u0432u043eu0434u00a0u0442 by welding the sides of the chamber after the u0432u044bu043fu043eu043bu043du0435u043du0438u00a0 of u0437u0430u0432u0435u0434u0435u043du0438u00a0 all pipes in the pipe to u043eu0442u0432u0435u0440u0441u0442u0438u00a0 ski and u043fu0440u0438u0432u0430u0440u043au0438 to duct board.;11. method for p.1, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0, u043eu0442u0432u0435u0440u0441u0442u0438u00a0 in side wall forming the duct board, u0432u044bu043fu043eu043bu043du00a0u044eu0442 under pipe diameter of 12 to 36 mm, with u043cu043du043eu0433u043eu0440u00a0u0434u043du044bu043c their position and displacement in each the house u0440u00a0u0434u0443 40 - 60% of their step in each u0440u00a0u0434u0443 u0432u044bu043fu043eu043bu043du00a0u044eu0442 20 - 70 holes, the number of u0440u00a0u0434u043eu0432 take from 3 to 16,and u043eu0442u0432u0435u0440u0441u0442u0438u00a0 under u0434u043bu00a0 u0441u043eu0435u0434u0438u043du0435u043du0438u00a0 connections with the collector supply or gas drainage in the bottom wall of u0432u044bu043fu043eu043bu043du00a0u044eu0442 cells of 2 - 4 with a diameter of 120 156 mm.;12. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the duct cell u0432u044bu043fu043eu043bu043du00a0u044eu0442 as chamber entrance strip apparatus of air u043eu0445u043bu0430u0436u0434u0435u043du0438u00a0 strip or section of the air u043eu0445u043bu0430u0436u0434u0435u043d u0438u00a0 strip, with u043eu0442u0432u0435u0440u0441u0442u0438u00a0 lower and / or upper walls used for connections with u0434u043bu00a0 u0441u043eu0435u0434u0438u043du0435u043du0438u00a0 collector supply of gas.;13. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the duct cell u0432u044bu043fu043eu043bu043du00a0u044eu0442 as cells exit gas of the air u043eu0445u043bu0430u0436u0434u0435u043du0438u00a0 strip or section of the air u043eu0445u043bu0430u0436u0434u0435 u043du0438u00a0 strip, with u043eu0442u0432u0435u0440u0441u0442u0438u00a0 lower and / or upper walls used for connections with the collector u0434u043bu00a0 u0441u043eu0435u0434u0438u043du0435u043du0438u00a0 gas drainage.;14. u0442u0440u0443u0431u043du0430u00a0 chamber apparatus of air u043eu0445u043bu0430u0436u0434u0435u043du0438u00a0 strip or section of the air u043eu0445u043bu0430u0436u0434u0435u043du0438u00a0 gas u0445u0430u0440u0430u043au0442u0435u0440u0438u0437u0443u044eu0449u0430u00a0u0441u00a0 because it made way for any from the u043fu043f.1 - 13.;15. the gas supply apparatus of air u043eu0445u043bu0430u0436u0434u0435u043du0438u00a0 strip or section of the air u043eu0445u043bu0430u0436u0434u0435u043du0438u00a0 gas u0445u0430u0440u0430u043au0442u0435u0440u0438u0437u0443u044eu0449u0430u00a0u0441u00a0 because it made way for p. 12.;16. chamber gas drainage apparatus of air u043eu0445u043bu0430u0436u0434u0435u043du0438u00a0 strip or section of the air u043eu0445u043bu0430u0436u0434u0435u043du0438u00a0 gas u0445u0430u0440u0430u043au0442u0435u0440u0438u0437u0443u044eu0449u0430u00a0u0441u00a0 because it made way for the p.13.
机译:1.方法 u0438 u0437 u0433 u043e u0442 u043e u0432 u043b u0435 u043d u0438 u00a0空气导管室设备 u043e u0445 u043b u0430 u0436 u0434 u0434 u0435 u043d u0438 u00a0空气带或空气段 u043e u0445 u043b u0430 u0436 u0434 u0435 u043d u0438 u00a0气体 u0445 u0430 u0440 u0430 u043a u0442 u0432 u0435 u0440 u0438 u0437 u0443 u044e u0449 u0438 u0439 u0441 u00a0,因为他在制造ivan u0434 u043b u00a0侧的金属板坯时, u043f u0440 u0435 u0434 u0443 u0441 u04c u04c u0430 u0442顶壁,底壁和边缘壁以及至少两个带有 u043e u0442 u0432 u0435 u045 u0440 u0441 u0442 u0438 u00a0 u0434 u043b u00b0的功率通过切割气流分流器的管道带有 u0434 u043b u00a0侧壁 u0432 u044b u043f u043e u043b u043d u00a0 u044e u0442长度对应于设备或设备宽度的单元,由 u0444 u0430 u0441制成 u043e u043a与厨师在一起,并且至少在 u0434 u043b u00a0侧壁中形成duc t和外部摄像机空白 u0434 u043b u00a0上壁和下壁 u0444 u0430 u0441 u043a u0438 u0432 u044b u043f u043e u043b u043d u004a u043f u043e u043e u0442从技术角度 u0440 u0430 u0441 u043a u0440 u044b u0442 u0438 u00a0 41 53之后的团队地点和焊接管道的种族形成了 u0438 u0437 u0433 u043e u0442 u043e u0432 u043b u0435 u043d u0438 u00a0毛坯 u043f u0440 u043e u0438 u0437 u0432 u043e u0434 u00a0 u0442的组装和连接是一致的,以便将侧壁与电源隔板焊接在一起并通过它们与图像 u043e u0432 u0430 u043d u0438 u0435 u043c整体刚性构造,其中 u043f u0440 u0438 u0441 u043e u0435 u0434 u0434 u0438 u043d u0030 u043e u043e u043e u0442构成风管板的侧壁之一, u0432 u044b u043f u043e u043b u043d u00a0 u044e u0442在热交换管末端受限制 u0440 u0441 u0442 u0438 u00a0,另一侧壁。在外侧板上, u0432 u044b u043f u043e u043b u043d u00a0 u044e u0442 u0441 u043e u043e u043e u0441 u043d u044b u0435和 u043e u0442 u0432 u0435 u0440 u0441 u0442 u0438 u00a0 u043c u0438在风管板上有螺纹 u043e u0442 u0432 u0435 u0440 u0441 u0442 u0438 u00a0 u0434 u043b u00a0 u043e u0431 u0431 u0435 u043f u0435 u0447 u0435 u043d u0438 u00a0机会 u0432 u0432 u0435 u0434 u0435 u043d u0438 u00a0技术 u0438 u043d u043d u0441 u0442 u0440 u0443 u043c u0435 u0434 u043b u00a0中的 u0442 u043e u0437 u0430 u043a u0440 u0435 u043f u043b u0435 u043d u0438 u00a0主要用于雕刻的管板中的所有管道以及后续安装的塞子 u043e u0442 u0432 u0435 u0440 u0441 u0442 u0438 u00a0 u0445外板以及下壁和/或上壁 u0432 u044b u043f u043e u043b u043d u043d u00a0 u044e u0442 u043e u0442 u0432 u0435 u0440 u0441 u0442 u0438 u00a0下的连接主要是 u0444 u043b u0430 u043d u0446 u0430 u043 c u0438 u0434 u043b u00a0 u0441 u043e u0435 u0434 u0438 u043d u0435 u043d u0438 u00a0并在筒仓中安装集气器或放气,以及在高层范围内安装的分区 u0441 u043e u0441 u0442 u0430 u0432 u043b u00a0 u044e u0449 u0435 u043c 1 / 4相机的高度 u0441 u0447 u0438 u0442 u0430 u00a0从高度的中间水平面开始相机的顶部侧壁。在安装相机并在风道板相机中安装了所有传热管之后,然后安装了相机; 2。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,以便分区 u0432 u044b u043f u043f u043e u043b u043d u00a0 将u044e u0442到 u043f u0440 u0438 u0441 u043e u0435 u0434 u0438 u043d u0435 u043d u0438 u00a0到细胞壁; 3。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,以便分区 u0432 u044b u043f u043f u043e u043b u043d u00a0 将 u043f u0440 u0438 u0441 u043e u0435 u0434 u0438 u043d u0435 u043d u0438 u00a0之后的它们放到腔室的壁上; 4.。 u043f u043f.2和3中的任何一个, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0上的方式,分区 u0432 u044b 中的系统安全漏洞确保带宽大于或小于与风道板连接的热交换管总容量的2%/ 3的总容量的5.9%以上; 5.保证带宽不小于总容量的5.9%。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,使光侧壁室的高度是光的宽度的1.9到3.2倍以及顶墙和底墙。 ok单元,其分区设置在光照下相机高度的中间三分之一内; 6。第1页的方法, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0,这样,腔室和隔板的壁 u0434 u043b u00a0主要在具有技术 u043f 的卧式机器上切割u0440 u0438 u043f u0443 u0441 u043a u043e u043c和技术 u0433 u0438 u0447 u0435 u0441 u043a u0438 u0439在宽度的每一侧上留有 u0434 u043b u00a0的余量 u0432 u044b u043f u043e u043b u043d u00a0 u044e u0442比侧壁的每一侧小1.9-2.2倍,而技术上的 u043f u0440 u0438 u043f u0443 u0441 u043a u0433 u043b u00a0边缘壁和金属 u0434 u043b u00a0分区的所有侧面均相等,其中 u0432 u044b u043f u043e u043b u043d u00a0 u043e u043e u043b隔板的宽度;; 7。第1页的方法, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0,以便在第一侧壁上组装腔室时, u043e u0431 u0440 u0430 u0437 u0443 u044e u0449 u0443 u044e风管板组的时间例如为 u043f u0440 u0438 u0445 u0432 u0430 u0442 u043a u043e u0439, u043f u0435 u0440然后将dki u0435 u0433 u043e u0440 u043e dki设置为第二侧壁的临时固定物,然后将其设置为外部板腔。设置用于临时固定的技术要素,以及构造 u0434 u043b u00a0 u043f u0440 u0438 u0432 u0430 u0440 u043a u0438隔墙以及房间的上下壁的可能性。 8。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,以便焊接设备和功率分配器 u043f u0440 u043e u0438 u0437 u0432 u0432 u043e在技​​术支持上,最好在加热的介质中加入惰性气体,例如二氧化碳,并随后进行清理焊缝和工艺控制。9。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,以便对腔室侧壁上的孔进行热处理和后续处理,例如 u0434 u0440 u043e u0431 u0435 u0441 u0442 u0440 u0443 u0439 u043d u043e u0439和 u043f u0440 u0438 u0432 u0430 u0440 u0440 u043a u043e u0439 u0440 u0440 u04340 u043f u0435 u0440 u043d u044b u0445技术 u043f u043b u0430 u0442 u0438 u043a u043e u0432。; 10。第9页的方法, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0,在 u0432 u044b u043f u043e u043e u043b u043d u0435 u043d u0438之后摄像机侧壁上的孔 u00a0移动空气的滑道组装装置 u043e u0445 u043b u0430 u0436 u0434 u0435 u043d u0438 u00a0条状或滑道上 u0441 u0431 u043e u0440 u043a设备和空气 u043e u0445 u043b u0430 u0436 u0434 u0435 u043d u0438 u00a0剥去腔室的边缘壁和 u043f u0440 u043e u0438 u0437 u0437 u0432 u043e u0434 通过在 u0432 u044b u043f u043e u043b u043d u043d u0435 u043d u0438 u00a0 of u0437 u0430 u0432 u0435 u0435 u0434 u0435 u043d u0438 之后焊接室的侧面来焊接u00a0 u00a0将管道中的所有管道连接到 u043e u0442 u0432 u0435 u0440 u0441 u0442 u0438 u00a0滑雪板和 u043f u0440 u0438 u0432 u0430 u0440 u04340 u043a u0438。第1页的方法, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0, u043e u0442 u0432 u0435 u0440 u0441 u0442 u0438 u00a0形成风管板的侧壁, u0432 u044b u043f u043e u043b u043d u00a0 u044e u0442在12至36 mm的管径下,具有 u043c u043d u043e u0433 u043e u0440 u00a0 u0434 u043d u044b u043c在每个房屋中的位置和位移 u0440 u00a0 u0434 u0443 u0440 u00a0 u0434 u0443 u0432 u044b u043b u043f u043e u043b u043d u00a0 u044e u0442 20-70个孔, u0440 u00a0 u0434 u043e u0432的数量从3到16,而 u043e u0442 u0432 u0435 u0440 u0441 u0442 u0438 u0434 u043b u00a0 u0441 u043e u0435 u0434 u0438 u043d u0435 u043d u0438 u00a0下的u00a0与集水器供气或 u0432 u044b u043f u043e 2-4个直径120 156毫米的单元; 12。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,这样风管单元 u0432 u044b u043f u043e u043e u043b u043d u00d0 u044e u0442作为空气室入口条装置 u043e u0445 u043b u0430 u0436 u0434 u0435 u043d u043d u0438 u00a0空气条或段 u043e u0445 u043b u0430 u0436 u0434 u0434 u0435 u043d u0438 u00a0带,带有 u043e u0442 u0432 u0435 u0440 u0441 u0442 u0438 u00a0下壁和/或上壁,用于与 u0434 u043b u00a0 u0441 u043e u0435 u0434 u0438 u043d u0435 u043d u0438 u00a0收集器供气; 13。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,这样,当细胞离开空气中的气体时,导管细胞 u0432 u044b u043f u043e u043b u043d u043e u0445 u043b u0430 u0436 u0434 u0434 u0435 u043d u0438 u00a0条形或空气部分 u043e u0445 u043b u0430 u0436 u0434 u0435 u043d u0438 u00a0条带,以及 u043e u0442 u0432 u0435 u0440 u0441 u0442 u0438 u00a0 /或用于与集热器连接的上壁 u0434 u043b u00a0 u0441 u043e u0435 u0434 u0438 u043d u0435 u043d u0438 u00a0放气。14。 u0442 u0440 u0443 u0431 u043d u0430 u00a0空气室设备 u043e u0445 u043b u0430 u0436 u0434 u0435 u043d u0438 u00a0空气条或段 u043e u0445 u043b u0430 u0436 u0434 u0435 u043d u0438 u00a0气体 u0445 u0430 u0440 u0430 u043a u0442 u0435 u0440 u0438 u0437 u0443 u0443 u044e u0449 u0430 u00a0 u0441它为 u043f u043f.1-;; 15中的任何内容让位。空气的供气设备 u043e u0445 u043b u0430 u0436 u0434 u0435 u043d u0438 u00a0空气条或段 u043e u0445 u043b u0430 u0436 u0434 u0434 u0435 u043d u0438 u00a0气体 u0445 u0430 u0440 u0430 u043a u0442 u0435 u0440 u0438 u0437 u0443 u044e u0449 u0430 u00a0 u0441 u00a0是因为它为p预留了空间。 12.; 16。空气室排气装置 u043e u0445 u043b u0430 u0436 u0434 u0435 u043d u0438 u00a0空气条或段 u043e u0445 u043b u0430 u0436 u0434 u0434 u0435 u043d u0438 u00a0气体 u0445 u0430 u0440 u0430 u043a u0442 u0435 u0440 u0438 u0437 u0443 u044e u0449 u0430 u00a0 u0441 u00a0,因为它为第13页预留了空间。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号