首页> 外国专利> PRODUCTION PLANNING METHOD IN PRODUCTION LINE HAVING REWORK PROCESS AND ITS PRODUCTION PLAN SYSTEM

PRODUCTION PLANNING METHOD IN PRODUCTION LINE HAVING REWORK PROCESS AND ITS PRODUCTION PLAN SYSTEM

机译:具有重做过程的生产线中的生产计划方法及其生产计划系统

摘要

PPROBLEM TO BE SOLVED: To provide a production planning method and a production plan system capable of preparing a production plan for a prescribed term with high accuracy by using a computer in a production system for producing a product having a rework process in production process procedures. PSOLUTION: The production planning method comprises a new component input recalculation step for using correction parameters FSBi, j/SBfor total input rates CSBi, j/SBby production processes, a product completion required amount ASBj/SB, a product yield BSBj/SBcollected as a result value, and the total input rates CSBi, j/SBby production processes and return rates DSBi, j/SBby production processes to recalculate the inputs XSBi, j/SBof the new component, and a load allocation step to each production process for allocating a load to each production process constituting a production line daily so as to be able to obtain the product completion required amount ASBj/SBon the basis of the recalculated inputs XSBi, j/SBof the new component in the new component input recalculation step to draft a production plan for a prescribed term. PCOPYRIGHT: (C)2006,JPO&NCIPI
机译:

要解决的问题:提供一种生产计划方法和生产计划系统,该生产计划方法和生产计划系统能够通过在生产系统中使用计算机来生产具有返工过程的产品的高精度地为规定期限准备生产计划。处理程序。

解决方案:生产计划方法包括一个新的组件输入重新计算步骤,该步骤将校正参数F i,j 用于生产过程的总输入速率C i,j ,产品完成需求量A j ,产品产出B j 作为结果值,总输入率C i,j 生产过程和生产过程的退货率D i,j 以重新计算新组件的输入X i,j ,并为每个生产过程分配负载步骤以进行分配每天对构成生产线的每个生产过程施加的负载,以便能够基于重新计算的输入X i,j 获得产品完成所需量A j 新组件输入重新计算步骤中的新组件的草稿,以草拟规定期限的生产计划。

版权:(C)2006,JPO&NCIPI

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号