首页>
外国专利>
Shipping schedule of the molten iron conveyance vehicle methodological
Shipping schedule of the molten iron conveyance vehicle methodological
展开▼
机译:铁水运输工具的运输时间表
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a method for planning an operation of a molten iron carring vehicle with which the operating order of the vehicle can be decided before allotting the vehicle for each charge.;SOLUTION: An average value of molten iron contents in the whole of the vehicle for receiving molten iron from a blast furnace and a delivered component reference value for charge in the delivering work side, are compared to decide the charge which is to use the pre-treated molten iron. In consideration of a time required for the pre-treatment, a corrected deliver-planning time for correcting the deliver-planning time, is calculated and in the order of this corrected deliver-planning time, the whole charges are arranged in this order and the vehicle is allotted in this order for each charge.;COPYRIGHT: (C)2003,JPO
展开▼