首页> 外国专利> Sinkage measure construction method null of high intensity reinforced concrete precast

Sinkage measure construction method null of high intensity reinforced concrete precast

机译:高强钢筋混凝土预制件下沉措施施工方法

摘要

PROBLEM TO BE SOLVED: To rapidly carry out the concrete paving work for a wide area, such as airport pavement and also perform a repair work easily for a partial differential settlement, upon completion of concrete pavement.;SOLUTION: In this concrete pavement laid by arranging rectangular plate- shaped or square plate-shaped high-strength reinforced concrete precast slabs 1 on subgrade G, a support plate 12 for lifting up is embedded along the laying direction of the high strength reinforced concrete precast slab 1 inside the subgrade G and at a position corresponding to the pipe 6 for the lift up jack attaching jig provided at the precast slab 1, a support plate 12 for lift-up is embedded, a lift-up jack attaching jig 15 is installed to the pipe 6, when the high strength reinforced concrete precast slab 1 is settled, thereafter, the lift-up jack 16 is operated the reaction of the lift-up jack 16 is taken by the support slab 12 for the lift-up by operating the lift-up jack 16, and the high-strength reinforcing concrete precast slab 1 is raised.;COPYRIGHT: (C)2001,JPO
机译:要解决的问题:在完成混凝土路面后,要在广泛的区域(例如机场路面)上迅速进行混凝土铺路工作,并且还可以轻松进行局部差异沉降的维修工作。在路基G上配置矩形板状或方板状的高强度钢筋混凝土预制板1,在路基G的内部且在路基G内,沿高强度钢筋混凝土预制板1的铺设方向埋设用于提升的支撑板12。在与设置在预制板1上的起重千斤顶安装夹具的管子6相对应的位置处,嵌入用于起重的支撑板12,在管道6上安装起重千斤顶安装夹具15。沉降强度增强的混凝土预制板1,此后,操作起重千斤顶16,通过操作起重千斤顶16,起重千斤顶16的反应被支撑板12进行起重。的高强度钢筋混凝土预制板1。.COPYRIGHT:(C)2001,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号