首页> 外国专利> Monitoring control device, power system protection control device, distributed control system, and storage medium storing program

Monitoring control device, power system protection control device, distributed control system, and storage medium storing program

机译:监视控制装置,电力系统保护控制装置,分散控制系统以及存储程序的存储介质

摘要

PROBLEM TO BE SOLVED: To execute a program associated with calculation processing, using state data based on state quantity taken from the equipment or the apparatus of a power system or the like, without depending the hardware. SOLUTION: This system is provided with an electricity quantity applied program module input means 21, a calculation processing means 24 for setting demand data DR based on an electricity quantity applied program module Pm held in the electricity quantity applied program module input means 21, an electricity quantity processing means 23 for generating the electricity quantity data Da corresponding to the demand data DR by processing and editing electricity quantity, based on the demand data DR delivered from the calculation processing means 24, and the calculation processing means 24 receiving the electricity quantity data Da generated by the electricity quantity processing means 23, and processing calculation based on the electricity quantity applied program module Pm with the received electricity quantity data Da.
机译:解决的问题:在不依赖于硬件的情况下,使用基于从电力系统的设备或装置等获取的状态量的状态数据来执行与计算处理相关的程序。解决方案:该系统具有电量应用程序模块输入装置21,计算处理装置24,用于基于保存在电量应用程序模块输入装置21中的电量应用程序模块Pm来设置需求数据DR,电量。电量处理装置23,用于基于从计算处理装置24传送来的需求数据DR,通过处理和编辑电量来生成与需求数据DR相对应的电量数据Da,并且计算处理装置24接收电量数据Da电量处理装置23生成的数据,并基于接收到的电量数据Da的电量施加程序模块Pm进行处理计算。

著录项

  • 公开/公告号JP3789036B2

    专利类型

  • 公开/公告日2006-06-21

    原文格式PDF

  • 申请/专利权人 株式会社東芝;

    申请/专利号JP19980045739

  • 发明设计人 西谷 泰周;関口 勝彦;川崎 智之;

    申请日1998-02-26

  • 分类号H02H3/02;H02J13;G05B15/02;

  • 国家 JP

  • 入库时间 2022-08-21 21:50:11

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号