首页>
外国专利>
Out the coal feeder (3) the coaling tonnage at halt point in time (11) holding
Out the coal feeder (3) the coaling tonnage at halt point in time (11) holding
展开▼
机译:从进煤器(3)停下的时间点(11)的结煤吨位
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To prevent decrease of exhaust gas and rise of a vapor temperature by accurately obtaining coal output to estimated to be discharged from a mill at the time of purging remaining coal and eliminating supply of the coal more than a required amount exceeding a fuel flow command into a furnace of a boiler. ;SOLUTION: The method comprises the steps of holding a coal output 11 at the time of stopping a stoker 3 at the time of mill tripping to make a remaining coal signal 12, multiplying the signal 12 by a coal output simulation gain 34 given as a function of a time based on test data previously obtained to obtain a coal output simulation signal 21, and outputting a coal output 23 estimated to be outputted from the mill at the time of purging the remaining coal.;COPYRIGHT: (C)1998,JPO
展开▼