首页> 外国专利> The method of construction (KY-5 Pipejacking and propulsion method) and apparatus for propulsion based on soft and weak layer soil

The method of construction (KY-5 Pipejacking and propulsion method) and apparatus for propulsion based on soft and weak layer soil

机译:基于软弱层土的施工方法(KY-5顶管和推进方法)和推进装置

摘要

The present invention is connected to the rear of the propulsion leading pipe (F) and said propulsion leading pipe (F) consisting of a device for installing a foundation of concrete (14) layer of the bottom, and apparatus for the propulsion lead tube forward and corrections a built-in secondary steel pipe (D) and, with the spiral steel pipe (G) is installed on a rear surface of the auxiliary steel pipe (D), gravel concrete 14, the outer lower portion of the auxiliary steel pipe (E) and the spiral steel pipe (G) is installed, is the space part (J) for forming the base layer, is formed on the rear of the spiral steel pipe (G) the soft ground press-driving method of construction using the advancement device (E) for forward movement by the step-down of the tube forward ( KY-5 promotion process) and the device.
机译:本发明连接到推进导管(F)的后部,并且所述推进导管(F)由用于安装底部的混凝土(14)层的基础的装置和用于推进导管的装置构成。并校正内置的次级钢管(D),并在辅助钢管(D)的后表面安装螺旋钢管(G)的同时,砾石混凝土14,辅助钢管的外部下部(E)和螺旋钢管(G)的安装,是用于形成基础层的空间部分(J),在螺旋钢管(G)的背面形成的软土地基压驱法施工前进装置(E),用于通过逐步降低管向前(KY-5推进过程)而向前运动。

著录项

  • 公开/公告号KR100538398B1

    专利类型

  • 公开/公告日2005-12-22

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20020075371

  • 发明设计人 한민호;

    申请日2002-11-29

  • 分类号E21D9/00;

  • 国家 KR

  • 入库时间 2022-08-21 21:27:15

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号