首页> 外国专利> CONNECTION STRUCTURE CONSTRUCTION METHOD OF HARBORS AT DEEP SEA USING WITH CAISSON

CONNECTION STRUCTURE CONSTRUCTION METHOD OF HARBORS AT DEEP SEA USING WITH CAISSON

机译:基于沉箱的深海港口连接结构构造方法

摘要

The present invention is in a dry state with deep-sea port on the caisson construction method of construction using a caisson to obtain a dry space in the water and complete the structure is constructed by continuously to minimize long-term settlement of the deep structure of the soft support layer and using the caisson to prevent differential settlement of the structure of the port of the structure construction method. ; as known for the present invention is provided with a buoyancy tank therein and provided with a plurality of through-casing and the construction of a continuous structure by using the deep sea port with a packing means in the lower caisson To this according, to the top is opened and coupled with a plurality of stakes through hole in communication with the casing through the bottom of the caisson with a ready-made concrete box, with the bottom of the caisson by a turnbuckle step, filling the buoyancy tank of the caisson caisson and a step of chimseol conjugate to the supporters of the ready-made concrete box, install the casing as the caisson chimseol penetrating the casing and the steps of the construction of foundation piles in the pile of ready-made concrete box through-holes, and the top of the pile foundation construction Pile step of pouring concrete into the space between the through-sphere, the ready-made concrete caisson and a step of draining the water inside the box, the steps of the ready-made concrete by pouring concrete inside the box to install a continuous enlarged base, the continuous Close the steps of forming a wall on top of the foundation, the walls and the filling process using the interior of the earth and sand or the like, to install the wall integral with the slab so that the upper part of the process and to complete the construction of the wall, ready-made to the caisson Remove the concrete box is characterized in that the portion made of a step of the caisson. ; Accordingly, the present invention can reduce the soil stabilization period for the installation of a deep-sea port structure, minimizing the long-term settlement of the structure of the soft support layer, and the effect to avoid the differential settlement of the structure there.
机译:本发明是在具有深海口的干燥状态下进行的,使用沉箱进行沉箱施工的方法是在水中获得干燥空间并通过连续地构造结构以最大程度地减少长期沉没的深部结构。软支撑层并使用沉箱来防止结构的结构端口差异沉降的构造方法。 ;如本发明所公知的,在其中设有一个浮力箱,并设有多个贯穿套管,并通过在下部沉箱中使用带有填充装置的深海港来构造连续结构。打开并与多个桩相连的通孔,该孔通过现成的混凝土箱通过沉箱的底部与壳体连通,沉箱的底部通过螺丝扣步骤填充沉箱沉箱的浮力箱,将chimseol与现成的混凝土箱的支撑物接合的步骤,将套管作为沉箱chimseol穿透壳体的步骤以及在现成的混凝土箱通孔桩中安装基础桩的步骤进行安装,桩基础施工的顶部桩步骤是将混凝土倒入通孔,现成的混凝土沉箱之间的空间中,以及将箱内的水排干的步骤,通过将混凝土倒入盒子中以安装连续的扩大的底座来完成现成的混凝土,连续地关闭在地基顶部形成墙的步骤,使用土和沙子的内部或内部填充墙或填充过程例如,将壁板与墙板安装成一体,以便在过程的上部完成壁板的施工,并为沉箱做好现成的工作。拆除混凝土箱的特征在于,该部分由台阶的一部分藻井。 ;因此,本发明可以减少用于安装深海港口结构的土壤稳定期,使软支撑层的结构的长期沉降最小化,并且具有避免在那里的结构的差异沉降的效果。

著录项

  • 公开/公告号KR20060020243A

    专利类型

  • 公开/公告日2006-03-06

    原文格式PDF

  • 申请/专利权人 SUNAM;

    申请/专利号KR20040069045

  • 发明设计人 BAE SUK DONG;

    申请日2004-08-31

  • 分类号E02D23;E02B3;

  • 国家 KR

  • 入库时间 2022-08-21 21:26:23

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号