Technical research on control of caisson construction for the middle tower foundation of Taizhou Bridge

机译:

获取原文
获取原文并翻译 | 示例
       

摘要

The real-time informational monitoring system is adopted in the construction of middle tower foundation of Taizhou Bridge for the first time. The geometric state of the caisson, the stress of upstream and downstream anchorage cables, underwater topography, the drag forces of the caisson cutting edge and frictional resistances of the sidewall and etc. are monitored in real time. According to the synthesized data analysis and decision-making system, the spatial states of the caisson are adjusted in time to locate and embed the deep water caisson precisely. The offset error of the caisson is less than 30 cm and the vertical error is 1/363 at the final stage. The control technology for construction of large caisson under deep water is concluded and would be helpful for the construction of bridge foundation in the future.
机译:采用实时信息监测系统在台州桥中塔基础第一次采用。沉箱的几何状态,上游和下游锚固电缆的应力,水下形貌,沉积的切割边缘的阻力和侧壁的摩擦阻力等实时监测。根据合成的数据分析和决策系统,沉箱的空间状态及时调整,以精确定位和嵌入深水沉箱。沉箱的偏移误差小于30厘米,最后阶段的垂直误差为1/363。深水下大沉箱施工控制技术得出了有助于将来建设桥梁基础。

著录项

  • 来源
    《工程科学(英文版)》 |2011年第2期|9-1345|共6页
  • 作者单位

    Key Lab of Large-Span Bridge Construction Technology, Ministry of Communication, Wuhan 430014, China;

    Key Lab of Large-Span Bridge Construction Technology, Ministry of Communication, Wuhan 430014, China;

    Key Lab of Large-Span Bridge Construction Technology, Ministry of Communication, Wuhan 430014, China;

    Key Lab of Large-Span Bridge Construction Technology, Ministry of Communication, Wuhan 430014, China;

  • 收录信息 中国科技论文与引文数据库(CSTPCD);
  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 06:58:42
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号