首页> 外国专利> HORIZONTAL COMPACTING METHOD OF WEAK SOIL WITH FILLING PULLED-OUT PILE HOLE

HORIZONTAL COMPACTING METHOD OF WEAK SOIL WITH FILLING PULLED-OUT PILE HOLE

机译:灌注桩打孔软土地基水平压实方法

摘要

To install based on soft ground or reclaimed gateuna would be the most reasonable method compaction, compaction is difficult to cause vibrations and noise, and deeply Dodge. Especially when the pledge itself impossible dajimyeon juicy clay be like porridge. Therefore, even though hwanto, top base, or by each pile foundation, and make changes to a descending high basic construction that a burden to the cost of construction and the air is also designed to accept waste of the front base.; In the present invention, it will be only a portion immediately below the column required for installing the base stand to present a method for improving the jinaeryeok ensure economic efficiency.; Between the soil making up the landfills or soft ground particles is characterized by a lot of water or air gap.; Books are pushed out clay in the course of weakness after the ground embellish hole recovered pile (1) filling the concrete or sand into the hole striking the collected stakes (1) in the first and third bridge the gap around the ground as a result, jinaeryeok this is enhanced. Many dry mud has to be carried out of the water around the soft ground as a step in the construction of the rest of the sand pile was removed through a sand pile to seonsigong some sand pile (4).; Sheet pile (6) of Figure 1 is to bind the peripheral when in the surrounding foundation ground is low or the ground is extremely soft concrete pile 5 and the sand pile (4) the order is out of verticality is inclined to the outside milryeonal . Bending of the sheet pile (6) inside the fitting (7) and an external fitting (8), both ends so that each other is then not even separated by pulling arrangement form is not even break the somewhat angle to form a circular arc instead of a straight line in breaking of the joints of Two transvestites to go to production. Placing the sheet pile (6) in a circular shape to a bakgo excavator construction the sand pile (4) to the internal increase in the internal pressure and each other sheet pile (6), the generated circumferential tension.; Soil foundation is a concrete pile arrangement in Figure 3 when the line may be of sufficient magnitude to prevent lateral movement of the heavier outer pile surface (5) may be substituted for the sheet pile (6) functions of Fig. But it will be able to safely support the lateral load caused by the construction of the sand pile (4) The concrete piles (5) using a rapid hardener and after curing seonsigong be premature. If further improve the ground jinaeryeok heavier than a concrete pile (5) of the outer frame as shown in Figure 3c can also be substituted with sand piles (4).; Concrete pile 5 and the sand pile (4) determines a casing (2) whether the use of 4, depending on soil conditions. Soil Soil This uses a simple method for filling sand recovered pile (1) When the order of a hole in the foil atda process will fall down the hole, remove the eda subtracting prevented by mounting the integral number of piles (1) of Figure 5 on excavators. However, within the soil Soil When very soft recovery pile (1) eda only pull the casing (2) in a state sandwiched between the casing (2) foil attached to the excavator and leave the casing 2 dunchae collected stakes (1) in FIG. 4 after filling the concrete, sand and performs the operation for extracting the casing (2).; Jinaeryeok size of the ground is proportional to the amount of time the night and the number of piles (1) resistance. Therefore, the ingestion by mutually comparing the size and the plate load test results of the resistor serve as the standard of jinaeryeok simplified determination.
机译:以软土地基或再生闸门为基础进行安装将是最合理的压实方法,压实难以引起振动和噪音,并深深地道奇。特别是当承诺本身不可能的时候,就像粥一样。因此,即使hwanto,顶部基础或每个桩基础都进行了改变,并且对下降的高基础结构进行了改变,这也增加了建筑成本和空气负担,也被设计为接受前部基础的浪费。在本发明中,将仅是安装底座所需的柱子的正下方的一部分,以提供一种改善经济性以确保经济效率的方法。在构成垃圾填埋场的土壤之间或软土地基颗粒之间存在大量的水或气隙。在地面软化孔回收的桩(1)将混凝土或沙子填充到孔中,撞击第一和第三座桥中收集的木桩(1)之后,书籍会在薄弱的过程中被推出黏土,结果是, jinaeryeok这是增强。 ;在施工过程中,必须从软土地周围的水中带走许多干燥的泥土,其余步骤是通过沙堆将剩余的沙堆移走,以顺次地挖出一些沙堆(4)。图1的板桩(6)是在周围基础地面低或地面为极软的混凝土桩5和沙堆(4)时,将外围束缚于外围。装配件(7)和外部装配件(8)内的板桩(6)的两端弯曲,以至于彼此之间甚至不通过拉动布置形式分开,甚至不会打断一定角度而形成圆弧在两个易装癖者的关节断裂的直线上进行生产。 ;将圆形的板桩(6)放置到bakgo挖掘机构造中,使砂堆(4)的内部压力增加到内部,并且彼此相接的板桩(6)产生周向张力。在图3中,土壤地基是混凝土桩的布置,当该线的大小足以防止较重的外部桩表面(5)侧向移动时,可以代替图3中的板桩(6)功能。为了安全支撑由沙堆(4)的施工引起的侧向载荷,混凝土桩(5)需使用快速硬化剂,并在将混凝土硬化后再过早固化。如果进一步改善地面jinaeryeok,使其比外部框架的混凝土桩(5)重,如图3c所示,也可以用沙桩(4)代替。混凝土桩5和沙桩(4)根据土壤条件确定壳体(2)是否使用4。土壤土壤这是一种用于填充回收砂堆的简单方法(1)当箔atda工艺中的孔的顺序从孔中掉落时,请通过安装图5的整数个桩来消除防止eda减法的作用(1)在挖掘机上。然而,在土壤内土壤当非常软的回收桩(eda)eda仅以夹在附着于挖掘机的壳体(2)箔之间的状态拉动壳体(2)时,而使壳体2的球茎收集了图1中的桩(1)。 。 4在填充混凝土后,撒砂并执行抽出套管(2)的操作。 Jinaeryeok地面的大小与夜间的时间长短和桩的数量成正比(1)阻力。因此,通过相互比较电阻器的尺寸和板负载测试结果而摄取的信号是jinaeryeok简化判定的标准。

著录项

  • 公开/公告号KR20060102931A

    专利类型

  • 公开/公告日2006-09-28

    原文格式PDF

  • 申请/专利权人 LEE CHANG NAM;

    申请/专利号KR20050025007

  • 发明设计人 LEE CHANG NAM;

    申请日2005-03-25

  • 分类号E02D3/10;

  • 国家 KR

  • 入库时间 2022-08-21 21:24:56

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号