首页> 外国专利> PILES, a device at the bottom with interlayers of soft soil

PILES, a device at the bottom with interlayers of soft soil

机译:PILES,底部装有软土夹层的设备

摘要

a device according to u043fu0440u043eu043fu043bu0430u0441u0442u043au0430u043cu0438 piles in weak soil, including immersion in soil extracted with u0442u0435u0440u00a0u0435u043cu044bu043c shell metal nozzle, have at the top end with a u0437u0430u0432u0435u0434u0435u043du043du0443u044e in cavity shell, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 so that upon reaching the tip of the barrel u0432u044bu0432u043eu0434u00a0u0442 through u043fu0440u043eu043fu043bu0430u0441u0442u043au0430 weak soil from the shell to u043eu0431u043du0430u0436u0435u043du0438u00a0 consistently.u043du0430u0447u0438u043du0430u00a0 lower u0440u00a0u0434u0430 u0438u043cu0435u044eu0449u0435u0439u0441u00a0 in clip perforations, through which, u0437u0430u043cu0435u043du00a0u00a0 gun tube with u043fu0430u043au0435u0440u043eu043c, download in weak soil u0437u0430u043au0440u0435u043fu0438u0442u0435u043bu044c, then the u043fu043eu0433u0440u0443u0436u0430 s to the next u043fu0440u043eu043fu043bu0430u0441u0442u043au0430 weak soil and u043fu043eu0432u0442u043eu0440u00a0u044eu0442 operation u043eu0431u0440u0430u0437u0443u00a0 fortified sites, interacting with the side surface of the pile after u0437u0430u043fu043eu043bu043du0435u043du0438u00a0 scr u0430u0436u0438u043du044b concrete and u0438u0437u0432u043bu0435u0447u0435u043du0438u00a0 shell.
机译:根据 u043f u0440 u043e u043f u043b u0430 u0441 u0442 u043a u0430 u043c u0438的设备在弱土中堆放,包括浸入 u0442 u0435 u0440 u00a0 u0435 u043c u044b u043c外壳金属喷嘴,在腔体外壳的顶端装有 u0437 u0430 u0432 u0435 u0434 u0434 u0435 u043d u043d u043d u0443 u044e u0430 u044e u0449 u0438 u0439 u0441 u00a0,以便在到达枪管尖端时 u0432 u044b u0432 u043e u0434 u00a0 u0442到 u043f u0440 u043e u043f u043b u04b u0441 u0442 u043a u0430从外壳到 u043e u0431 u043d u0430 u0436 u0435 u043d u0438 u00a0一致。 u043d u0430 u0447 u0438 u0438 u043d u0430 u0030较低的 u0440 u00a0 u0434 u0430 u0438 u043c u0435 u044e u0449 u0435 u0439 u0441 u00a0在夹子穿孔中,通过其中 u0437 u0430 u043c u0435 u043d u043d u00a0 u00a0 u043f u0430 u043a u0435 u0440 u043e u043c,下载到弱土 u0437 u0430 u043a u0440 u0435 u043f u0438 u0442 u0435 u043b u044c,然后将 u043f u043e u0433 u0440 u0443 u0436 u0430到下一个 u043f u0440 u043e u043f u043b u0430 u0441 u0442 u0432 u043a u0430 u043e u0432 u0442 u043e u0440 u00a0 u044e u0442操作 u043e u0431 u0440 u0430 u0437 u0443 u00a0加固的位置,在 u0437 u0430 u043f 之后与桩的侧面相互作用u043e u043b u043d u0435 u043d u0438 u00a0 scr u0430 u0436 u0438 u043d u044b混凝土和 u0438 u0437 u0432 u043b u0435 u0447 u0435 u043d u043d u0438 u00a0 shell。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号