METHOD FOR LAND RECLAMATION IN THE CASE OF LAND CORRUPTION BY OPENED DEPOSIT DEVELOPMENT

机译:露天矿开发导致土地毁坏的土地复垦方法

摘要

FIELD: mining, particularly reclamation of surface-mined areas in agriculture and building industry.;SUBSTANCE: method involves selectively mining, moving and accumulating ground layer and overburden in separate strip dumps; excavating open-pit field; smoothing thereof and ground layer laying. After open-pit field excavation the excavated space is filled with building waste up to high ground water layer. The building waste has composition close to that of natural minerals with different fraction dimensions. The building waste is laid in several layers each having thickness of 40-60 cm. Each layer is compacted with soil compactors or compacting mechanism. Then draining layer is laid. The draining layer is layer of gravel-sand ground with particle dimensions of not more than 200 mm and has thickness of not less than 0.6 m. The draining layer is compacted by vibratory plates. Then two parallel spiral channels are excavated along each pit perimeter from slope side. Coil of each channel starts at pit slope top and terminates at bottom thereof at upper ground water level. Both channels are filled with building waste having particle dimensions of not more than 150 mm. After that holes for trees planting are dug out, wherein the holes are arranged between channel coils. Drainage layer is located on hole bottoms so that the drainage layer is connected with building waste of the channels and holes are filled with fertile ground. Then perennial grass, bushes and trees are planted in the reclamated land.;EFFECT: reduced labor inputs and reclamation work costs, improved land protection against wind erosion and scouring.;2 cl, 1 dwg
机译:领域:方法包括选择性地开采,移动和积累地表层和覆盖层在单独的露天矿场中;露天矿场其平滑和底层铺设。在露天矿场开挖后,开挖的空间充满了建筑废料,直至地下水位较高。建筑废料的组成与天然矿物的组成接近,具有不同的馏分尺寸。建筑垃圾分为几层,每层厚度为40-60厘米。每层用土壤压实机或压实机构压实。然后铺设排水层。排水层是砂砾地面层,其颗粒尺寸不大于200mm,厚度不小于0.6m。排水层通过振动板压实。然后,从斜坡侧沿每个坑周长开挖两个平行的螺旋通道。每个通道的线圈都从坑斜顶部开始,并在地下水位较高处终止于其底部。两个通道都充满了粒径不超过150毫米的建筑垃圾。之后,挖出用于植树的孔,其中将孔布置在通道线圈之间。排水层位于孔的底部,因此排水层与通道的建筑废料相连,孔被肥沃的土地填充。然后在开垦后的土地上种植多年生草,灌木和树木。效果:减少劳动力投入和开垦工作成本,改善对风蚀和擦伤的土地保护; 2 cl,1 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号