首页>
外国专利>
INTEGRATED PLANNING, control and accounting for project management and Trades
INTEGRATED PLANNING, control and accounting for project management and Trades
展开▼
机译:项目管理和交易的综合计划,控制和会计
展开▼
页面导航
摘要
著录项
相似文献
摘要
The invention relates to the economic process control systems in which it is advisable to plan and monitor the onset of certain business events and to conduct financial or documentary records of the results.; Technical result of utility model is to expand the arsenal of the system, eliminating the drawbacks of analogues and to provide a system which eliminates the possibility of the business transactions that do not match scheduled events on time and on budget, eliminates the possibility of a business transaction by a person not authorized in accordance with the events of the implementation of plans and provides full and fair events display the fact on time and on budget in the project management information system.; The technical result is reached by that in an integrated system of planning, controlling and accounting for project management and business activities with division of authority between the users, comprising as at least one memory unit for at least one input unit assignment system in electronic form, and at least one display unit job events, new is the fact that the system includes a processing unit, which is associated with a block of project planning and economic activities on time, budget and resources, and bl eye execution and accounting of transactions, which, in turn, are compared with each other by comparing the information block, the block project planning and economic activity comprises, for each of the planned events of the attributes of time and budget in relation to the movement of funds and resources, and to each of the events is assigned a unique identifier, and block execution of business operations and generates and allows for documents relating to the execution of scheduled events, and formed Contents document event carried out with a mandatory establishing communication between the event and the document by selecting the identifier corresponding event to avoid the possibility of uncontrolled business transaction with inappropriate identifier and discrepancies in time and budget and actual budget execution and timing of the scheduled event, recorded in the execution unit and of business operations is reflected in the planning of projects and unit of economic activity and the mapping unit eniya job events.
展开▼