首页> 外国专利> Building method for tunnel structures cover manner of construction using compressed air and building sole for carrying out the construction method

Building method for tunnel structures cover manner of construction using compressed air and building sole for carrying out the construction method

机译:隧道结构的施工方法覆盖使用压缩空气的施工方式以及实施该施工方法的建筑底

摘要

Building method for tunnel structures cover manner of construction using compressed air, comprising the steps of concreting of the building ceiling, excavation under the cover provided with compressed air, produce a structure the sole and the further removal of the tunnel building, characterized in that the building sole is curved away from the cover is installed, then the compressed air is switched off and the further removal is continued at a normal atmosphere.
机译:隧道结构的覆盖方法是使用压缩空气进行施工的方法,包括将建筑物的顶棚浇筑,在覆盖有压缩空气的覆盖层下进行挖掘,将结构制成底部并进一步去除隧道建筑物的步骤,其特征在于:将建筑鞋底弯曲成远离覆盖层的位置,然后关闭压缩空气,并在正常气氛下继续去除。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号