首页>
外国专利>
At the time of the increase reconstruction construction of bearing wall conversion construction method of the non bearing wall
At the time of the increase reconstruction construction of bearing wall conversion construction method of the non bearing wall
展开▼
机译:非承重墙增加时的承重墙改造施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide methods for saving labor and reducing industrial waste by changing a non-bearing wall of an existing building part into a bearing wall with sufficient strength without removing the non-bearing wall together with the framework in the extension construction of dwelling houses.;SOLUTION: This method for changing the non-bearing wall into the bearing wall comprises a cutting step for cutting the existing intermediate rails of the framework having shaft columns and shaft rails disposed in a frame shape, existing intermediate rails, and intermediate columns, a new intermediate rail mounting step for disposing the new intermediate rails having cutout parts formed therein, a bearing brace mounting step allowing the bearing braces to pass the cutout parts of the new intermediate rails therein and fixing both end parts thereof to the corner parts of the framework with a fixing tool, and a reinforcement member mounting step for disposing the reinforcement intermediate rails for reinforcing the new intermediate rails.;COPYRIGHT: (C)2005,JPO&NCIPI
展开▼