Being construction method of the bearing wall structure where the bearing wall structure null permanent anchor which was constructed with the construction method and this
Being construction method of the bearing wall structure where the bearing wall structure null permanent anchor which was constructed with the construction method and this
展开▼
机译:承重墙构造的施工方法,其中承重墙构造为用该构造方法构造的永久性锚固件,
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To allow permanent anchors to function also as temporary anchors in construction wall structure provided with the permanent anchors.;SOLUTION: After driving an earth retaining pile 10, the oblique type permanent anchors 14 are driven while excavating the ground inside the earth retaining pile 10, and wales 20 are mounted to the earth retaining pile 10. Further, pedestals 22 are mounted to the wales 20, and the tensed permanent anchors 14 are anchored to the pedestals 22. After constructing the permanent anchors 14 in all stages, concrete of the wall structure 16 is placed up to the height of the lower part of the pedestal 22 in order from the lower stage to release anchor tension, and the pedestal 22 and wale 20 are dismantled and removed. After placing concrete on the following stage, the anchor is tensed again and anchored to the concrete. These processes are repeated.;COPYRIGHT: (C)2005,JPO&NCIPI
展开▼