首页>
外国专利>
Construction methods and fire compartment through part structure of the fire compartment through part
Construction methods and fire compartment through part structure of the fire compartment through part
展开▼
机译:隔火部分的构造方法和隔火部分的结构
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To prevent the heat, flames, smokes, etc., generated on one side of a partitioning part of a fire control partition penetration part 5 from reaching the other side.;SOLUTION: A tape-form molding 2 having a magnification power in expansion of 3-40 when heated for 30 min in an irradiating calorific quantity of 50 kw/m2 and consisting of a thermo-expansive material having stickiness is wound round the fire control partition penetration part 5 of resin piping, cable, or heat-insulating covered pipe 1, and the gaps between the fire limit penetration part 5 and the resin piping, cable, or heat-insulating covered pipe 1 are filled with mortar, non-combustible material, or putty 4, and at this time, the tape- form molding 2 on whose one surface a die-releasing base material 6 is laminated is wound round on the resin piping, cable, or covered pipe 1 at least one turn in such a way that the base material 6 is positioned outside, and then fixed through utilization of its stickiness.;COPYRIGHT: (C)2003,JPO
展开▼
机译:解决的问题:为了防止在火隔离隔板穿透部分5的隔板的一侧上产生的热量,火焰,烟雾等到达另一侧。解决方案:带状模制件2具有在发热量为50kw / m 2 Sup>的热量下加热30分钟并由具有粘性的热膨胀材料制成的3-40倍的放大倍数被缠绕在火隔离壁穿透部分周围在树脂制配管,电缆或隔热套管1中,如图5所示,在防火极限贯穿部5与树脂制配管,电缆或隔热套管1之间的间隙中填充灰浆,不燃材料或腻子4,此时,将层叠有脱模性基材6的带状成型品2在树脂配管,电缆或被覆管1上至少卷绕一圈,使得基材6位于外部,然后利用固定其粘性。;版权:(C)2003,日本特许厅
展开▼