Prestressed concrete wind power plant tower and method of building the tower
Prestressed concrete wind power plant tower and method of building the tower
展开▼
机译:预应力混凝土风力发电厂塔架及其建造方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
A method for assembling towers using prestressed concrete segments has holes incorporated through the segments to take tensioning cables. The holes are spaced around the circumference of each segment and align with similar holes in the adjacent segments. To ease the feeding of the tensioning cable the top of each hole has a tapering profile, with the widest aperture at the entry to the hole. The taper is between 10 and 150 deg. and the widest aperture is less than the wall thickness of the segments. The holes are formed by performs fitted into the moulds for the segments.