首页> 外国专利> Metalworking production line sub-assemblies move through a series of beam welding heads operated sequentially by the same power supply unit

Metalworking production line sub-assemblies move through a series of beam welding heads operated sequentially by the same power supply unit

机译:金属加工生产线子组件移动通过由同一电源单元顺序操作的一系列束焊头

摘要

Claimed is a manufacturing process and manufacturing system for the production of a sub-assemblies consisting of several parts (1-3) at several production stations (32, 33). The sub assemblies advance through two or more beam welding stations powered in sequence by the same power supply unit. At the first production station (32) components (1-3b) are presented to a first beam welding station with a first welding head (121), where the components are clamped (111) together and welded. These components then advance (45) from which the welded group (122) is then transferred to a second production station (33), where it is brought together with a further group (1-3b) and advanced to a second beam welding head (146a). The two groups are clamped together and welded. The resulting component group (147) advances through a second transfer zone (129). The beam welding heads (121, 146a) are alternately powered from a single energy source (34).
机译:本发明要求保护一种用于在多个生产站(32、33)处生产由多个零件(1-3)组成的子组件的制造工艺和制造系统。子组件前进通过由同一电源单元顺序供电的两个或多个束焊接工位。在第一生产工位(32),将组件(1-3b)送至具有第一焊接头(121)的第一梁焊接工位,在此将组件夹紧(111)并焊接在一起。然后将这些组件推进(45),然后将焊接组(122)从其中转移到第二生产站(33),在该站中将其与另一个组(1-3b)放在一起,并推进到第二束焊头( 146a)。两组被夹紧在一起并焊接在一起。所得组分组(147)前进通过第二转移区(129)。束焊接头(121、146a)由单个能源(34)交替供电。

著录项

  • 公开/公告号AT501245B1

    专利类型

  • 公开/公告日2006-11-15

    原文格式PDF

  • 申请/专利号AT20040002193

  • 发明设计人

    申请日2004-12-29

  • 分类号B23K37/047;

  • 国家 AT

  • 入库时间 2022-08-21 20:54:54

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号