p electronic network based on work schedule management system of the present invention is connected to the network, and in the work schedule management MBO (Management By Object) and instructions (cooperation) to give the business mileage and optional instruction (cooperation) generates a business, received (Sangsin) work in accordance with, the generated instruction (cooperation) business and received (Sangsin) the progress of the work and pending and schedule management server that performs verification and mileage adjustment of completed work; MBO information, instructions (cooperation) work, receiving (Sangsin) and a database in which information is stored and the information stored in accordance with the control of the schedule management server, the update on the work; Instructions to access and log into the scheduling server over the network (cooperation) work, receiving (Sangsin) generates a work comprising at least one terminal and the open state and proceeds to process the check and adjustment of the mileage of the finished work which work The. Task scheduling management system of the present invention is to improve the efficiency of the enterprise business process given the mileage according to the characteristics of the work order generation and Sangsin during work and the work proceeds in accordance with the MBO (Management By Object) can improve the work efficiency .
展开▼