A kind of method, for automatically configuring, monitoring, a baseline for managing a CDM projects is arranged to the data for instructing/automatically calculating baseline and search for other evidence with input firsthand information, by automatically selecting a research method of CDM projects and automatically calculating greenhouse gas emission/reduction according to determining research method. By being connected to the network server of an operator (S10), after a client PC input master data related with CDM projects, baseline is set. Client PC selects a project type, increases possibility step (S20) or monitoring step (S30) selected from one. It is set to receive the baseline of a project plan of a certificate for CDM projects, research method is applied, and is increased possibility or monitoring and is handled by making the network server of operator be capable of handling selected step and transmit a result to client PC.
展开▼