首页> 外国专利> COMPLEX PILE COMMECTED INTEGRAL STEEL PILE TO PRESTRESSED CONCRETE COMPOSITE PILE AND METHOD FOR WORKING USING IT

COMPLEX PILE COMMECTED INTEGRAL STEEL PILE TO PRESTRESSED CONCRETE COMPOSITE PILE AND METHOD FOR WORKING USING IT

机译:预应力混凝土复合桩的复合桩对接整体钢桩及其使用方法

摘要

A complex pile formed by integrally connecting a steel pile to a prestressed concrete composite pile and a pile construction method using the same are provided to prevent corrosion of the pile due to seawater by bearing bending load, and to cut down the construction cost by reducing the construction period. A prestressed concrete composite pile(30) is inserted to an upper connecting part of a connecting socket, and the upper connecting part is placed in a boundary(55) of the prestressed concrete composite pile and a steel pile(40). A lower connecting part of the connecting socket functions as a welding heat relief range(52) by connecting a lower end of the lower connecting part to the steel pile with welding. The boundary between the prestressed concrete composite pile and the steel pile is set with a margin(56) from a virtual seabed(15), and a complex pile is manufactured by welding the steel pile in the welding heat relief range. A pier or quay is installed by mounting the complex piles repeatedly.
机译:提供一种通过将钢桩与预应力混凝土组合桩一体地连接而形成的复杂桩以及使用该桩的施工方法,以防止由于轴承的弯曲载荷而导致的海水对桩的腐蚀,并通过降低桩的建造成本来降低建造成本。施工期。将预应力混凝土复合桩(30)插入连接插座的上部连接部分,并且将上部连接部分置于预应力混凝土复合桩与钢桩(40)的边界(55)中。连接插座的下部连接部通过将下部连接部的下端与钢桩连接而作为焊接散热范围(52)。在预应力混凝土复合桩和钢桩之间的边界设置一个与虚拟海床(15)的边距(56),并通过在焊接散热范围内焊接钢桩来制造复杂桩。通过重复安装复杂的桩来安装码头或码头。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号