首页> 外国专利> METHOD OF CONSTRUCTION PLASTICS IN DRAINAGE high water table AND DEVICE FOR IMPLEMENTATION

METHOD OF CONSTRUCTION PLASTICS IN DRAINAGE high water table AND DEVICE FOR IMPLEMENTATION

机译:排水高水位中的建筑塑料方法及实施装置

摘要

1.method of construction of plastic drainage with a high level of groundwater, including the formulation of the inverse u0432u0440u0430u0449u0435u043du0438u00a0 u0443u0437u043au043eu0442u0440u0430u043d trench body chain cervical u0434u0440u0435u043du043eu0443u043au043bu0430u0434u0447u0438u043au0430 displacement between the walls of the trench and bunker u0434u0440u0435u043du043eu0443u043au043bu0430u0434u0447u0438u043au0430 developed soils that drain pipe is provided in the tr u0430u043du0448u0435u044e through u043du0430u043fu0440u0430u0432u043bu00a0u044eu0449u0443u044e, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0, stowage dren.u0441u043eu0441u0442u043eu00a0u0449u0438u0445 of two pipes with a synthetic filter, the flexible u0441u0432u00a0u0437u00a0u043cu0438 in whiplash, u0432u044bu043fu043eu043bu043du00a0u044eu0442 pitch in u043du0430u043fu0440u0430u0432u043bu00a0u044eu0449u0443u044e greater axis transverse u0441u0435u0447u0435u043du0438u00a0 lash u0432u0434u043e if the axis of the trench, and the tiling is greater axis transverse u0441u0435u0447u0435u043du0438u00a0 - across the axis of the trench with its setting in the sinuses, u0432u044bu043fu043eu043bu043du00a0u0435u043cu044bu0435 in the walls of the trench, to the extent of not more than 0.2 width w flywith one of the pipes being u0437u0430u0433u043bu0443u0448u043au0430u043cu0438 and open after the u0441u043du0438u0436u0435u043du0438u00a0 u0443u0440u043eu0432u043du00a0 groundwater.;2. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the hair u043eu0441u0443u0449u0435u0441u0442u0432u043bu00a0u044eu0442 dren in the form of stripes, u0441u043eu0441u0442u043eu00a0u0449u0435u0439 of two pipes with different u0432u043eu0434u043eu043fu0440u0438u0435u043cu043du043eu0439 ability, closing u0437u0430u0433u043bu0443u0448u043au0430u043cu0438 pipe at u0432u043eu0434u043eu043fu0440u0438u0435u043cu043du043eu0439 ability and open it after u0441u043du0438u0436u0435u043du0438u00a0 u0443u0440u043eu0432u043du00a0 groundwater.;3.the proposed method is u0434u043bu00a0 u043eu0441u0443u0449u0435u0441u0442u0432u043bu0435u043du0438u00a0 u0443u0437u043au043eu0442u0440u0430u043du0448u0435u0439u043du044bu0439 u0434u0440u0435u043du043eu0443u043au043bu0430u0434u0447u0438u043a consisting of basic machine, a working body reverse u0432u0440u0430u0449u0435u043du0438u00a0, the dre u043du0430u0436u043du043eu0439 pipes with u043du0430u043fu0440u0430u0432u043bu00a0u044eu0449u0435u0439, bunker, educated u0434u0432u0443u043cu00a0 longitudinal and u0434u0432u0443u043cu00a0 transverse vertical walls with the front end of the cutting part, and u043eu0442u043bu0438u0447u0430u044eu0449u0435u0435u0441u00a0 lemekh, etc. eat that, at the cutting part of the ploughshare is installed demountable shaped lateral u043eu0442u043au0440u044bu043bu043au0438,u043du0430u043fu0440u0430u0432u043bu00a0u044eu0449u0430u00a0 drainage tubes placed in the bunker and is composed of a vertical bar, through the u0441u043fu0438u0440u0430u043bu0435u0432u0438u0434u043du0443u044e part u0441u043eu043fu0440u00a0u0436u0435u043du043du043eu0439 with complete ploughshare, and the ans. u0435u0440u0441u0442u0438u0435 drainage pipes on the vertical rack is of greater transverse u0441u0435u0447u0435u043du0438u00a0 axis along the axis of the device, and an axis hole is greater u043fu043eu043fu0435u0440u0435u0447 ploughshare the main u0441u0435u0447u0435u043du0438u00a0 across the axis of the device.
机译:1,建设高地下水位塑料排水的方法,包括反 u0432 u0440 u0430 u0449 u0435 u043d u0438 u00a0 u0443 u0437 u043a u043e u0442 u0440 u0430 u043d沟渠体链子宫颈 u0434 u0440 u0435 u043d u043e u0443 u043a u043b u0430 u0434 u0447 u0438 u043a u0430沟渠壁与掩体之间的位移 u0434 u0440 u0435 u043d u043e u0443 u043a u043b u0430 u0434 u0447 u0438 u043a u0430已开发的土壤在tr u0430 u043d u0448 u0435 u044e至 u043d u0430 u043f u0440 u0430 u0432 u043b u00a0 u044e u0449 u0443 u044e, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0,积载纸管。 u0441 u0442 u043e u00a0 u0449 u0438 u0445带有合成过滤器的两个管道,在鞭打中的柔性 u0441 u0432 u00a0 u0437 u00a0 u043c u0438, u0432 u044b u043f u043e u043d u0430 u043f u0440 u0430 u0432 u043b u00a0 中的u043b u043d u00a0 u044e u0442间距u044e u0449 u0443 u044e大轴横向 u0441 u0435 u0447 u0435 u043d u0438 u00a0睫毛 u0432 u0434 u043e如果沟槽的轴和平铺是大轴横向 u0441 u0435 u0447 u0435 u043d u0438 u00a0-在鼻窦中横过沟槽的轴线, u0432 u044b u043f u043e u043b u043d u00a0 u0435 u043c u044b u0435在不超过0.2宽度的范围内挖沟,其中一根管道为 u0437 u0430 u0433 u043b u0443 u0448 u043a u0430 u043c u0438并在 u0441 u043d u0438 u0436之后打开 u0435 u043d u0438 u00a0 u0443 u0440 u043e u0432 u043d u00a0地下水; 2。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,这样头发 u043e u0441 u0443 u0449 u0435 u0431 u0441 u0442 u0432 u043b u00a0 u044e u0442带状条纹, u0441 u043e u0441 u0442 u043e u00a0 u0449 u0435 u0439的两个管道具有不同的 u0432 u043e u0434 u0434 u043e u043f u0440 u0438 u0435 u043c u043d u043e u0439能力,关闭 u0437 u0430 u0433 u043b u0443 u0448 u043a u0430 u043c u0438管道位于 u0432 u043e u043e u0434 u043e u043f u0440 u0438 u0435 u043c u043d u043e u0439能力并在 u0441 u043d u0438 u0436 u0435 u043d u0438 u00a0 u0443 u0440 u043e u0432 u043d u043d u00a0地下水后将其打开。3。提出的方法是 u0434 u043b u00a0 u043e u0441 u0443 u0449 u0435 u0431 u0441 u0442 u0432 u043b u0435 u043d u043d u0438 u00a0 u0443 u0437 u043a u043a u043e u0442 u0440 u04330 u0448 u0435 u0439 u043d u044b u0439 u0434 u0440 u0435 u043d u043d u043e u0443 u043a u043b u0430 u0434 u0434 u0447 u0438 u043a由基本机器组成,工作体反向 u0432 u0440 u0 430 u0449 u0435 u043d u0438 u00a0,dre u043d u0430 u0436 u043d u043e u0439管道带有 u043d u0430 u043f u0440 u0430 u0432 u043b u043b u00a0 u043e u043e u0439,bun堡,受过教育的 u0434 u0432 u0443 u043c u00a0纵向和 u0434 u0432 u0443 u043c u00a0横向垂直壁(带有切割部分的前端),以及 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0435 u0435 u0441 u00a0 lemekh等,在犁share的切割部分上安装了可拆卸的异形侧面 u043e u0442 u043a u0440 u044b u043b u043a u0438 , u043d u0430 u043f u0440 u0430 u0432 u043b u00a0 u044e u0449 u0430 u00a0排水管放在仓中,并由垂直杆组成,穿过 u0441 u043f u0438 u0440 u0430 u043b u0435 u0432 u0438 u0434 u043d u0443 u044e部分 u0441 u043e u043f u0440 u00a0 u0436 u0435 u043d u043d u043d u043e u0439具有完整的犁share。 u0435 u0440 u0441 u0442 u0438 u0435垂直机架上的排水管沿设备的轴具有较大的横向 u0441 u0435 u0447 u0435 u043d u0438 u00a0轴,并且轴孔较大 u043f u043e u043f u0435 u0440 u0435 u0447沿设备的轴共享主 u0441 u0435 u0447 u0435 u043d u0438 u00a0。

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号