首页> 外国专利> Shower installation operation method, involves heating shower water in panel to maximum permissible temperature, by heat exchange procedure of cold water from cold water circuit with hot water from hot water circuit

Shower installation operation method, involves heating shower water in panel to maximum permissible temperature, by heat exchange procedure of cold water from cold water circuit with hot water from hot water circuit

机译:淋浴安装操作方法,涉及通过将冷水回路中的冷水与热水回路中的热水进行热交换程序,将面板中的淋浴水加热到最高允许温度。

摘要

The installation has a shower panel, which is connected to a hot water circuit (16) of an energy buffer or a central heater. The shower water in the panel is heated to a maximum permissible temperature, by a heat exchange procedure of the cold water from a cold water circuit (34) with the hot water from the hot water circuit. The heated shower water is added to the user-sided requirement dependant cold water from the cold water circuit. An independent claim is also included for a shower panel comprising a hot water circuit.
机译:该设备具有淋浴面板,该淋浴面板连接至能量缓冲器或中央加热器的热水回路(16)。通过将来自冷水回路(34)的冷水与来自热水回路的热水进行热交换,将面板中的淋浴水加热到最高允许温度。加热的淋浴水被添加到来自冷水回路的用户侧需求相关的冷水中。还包括具有热水回路的淋浴面板的独立权利要求。

著录项

  • 公开/公告号DE102005063032A1

    专利类型

  • 公开/公告日2007-07-05

    原文格式PDF

  • 申请/专利权人 BEHM WOLFGANG;

    申请/专利号DE20051063032

  • 发明设计人 BEHM WOLFGANG;

    申请日2005-12-29

  • 分类号E03C1/044;

  • 国家 DE

  • 入库时间 2022-08-21 20:29:32

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号