METHOD OF DISASSEMBLING AND REMOVING SUPPORT BEAM AND UPPER SUPPORT BEAM

机译:拆卸和拆除支撑梁和上部支撑梁的方法

摘要

PPROBLEM TO BE SOLVED: To provide a method of disassembling and removing a support beam capable of shortening a traffic interruption time and an upper support beam. PSOLUTION: After a bridge 3 is constructed through the upper support beam 6 constructed by supporting it on a lower support beam, a supporting lateral beam 14 having a moving device on the bridge 3 is so installed as to be extended from the bridge 3. A suspended member 16 is suspended from the extension end part of the supporting lateral beam 14 through a jack 15 or a hoist. After the upper support beam 6 is moved in the bridge axis direction with the upper support beam 6 supported on the lifted support member 16, the upper support beam 6 is disassembled and removed. The upper support beam used for the method of disassembling and removing the upper support beam 6 is also provided. PCOPYRIGHT: (C)2009,JPO&INPIT
机译:

要解决的问题:提供一种拆卸和移除能够缩短交通中断时间的支撑梁和上部支撑梁的方法。

解决方案:在通过将上部支撑梁6支撑在下部支撑梁上而构造的上部支撑梁6构成桥梁3之后,将具有移动装置的支撑侧梁14安装在桥梁3上,以从该桥梁延伸出来。 3.悬架部件16通过千斤顶15或起重机从支撑横梁14的延伸端部悬架。在上支撑梁6被支撑在抬起的支撑构件16上的情况下,上支撑梁6在桥轴线方向上移动之后,上支撑梁6被拆卸和移除。还提供了用于拆卸和移除上支撑梁6的方法的上支撑梁。

版权:(C)2009,日本特许厅&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号