首页> 外国专利> TRANSIT SHAFT CONSTRUCTION METHOD AND JACKING METHOD

TRANSIT SHAFT CONSTRUCTION METHOD AND JACKING METHOD

机译:竖井施工方法及顶进方法

摘要

PROBLEM TO BE SOLVED: To provide a new technical means for solving problems of a conventional jacking method for constructing a transit shaft and carrying out propulsion, and drastically reducing workloads and burden of costs, to thereby avoid troubles and risks during execution of work.;SOLUTION: There is provided a transit shaft 6 construction method for arranging the transit shaft 6 between a starting shaft and an arrival shaft, for carrying out propulsion. According to the method, a steel casing 62 which has holes 61 formed therein beforehand, as transit ports for a propelling machine 7, is pressed into the ground without excavating soil inside the steel casing 62 to a level in excess of overburden necessary at the time of the propulsion. Then the propelling machine 7 is allowed to pass through the transit port holes 61 formed in the transit shaft 6 constructed in the method, and thereafter the soil in the steel casing 62 is excavated.;COPYRIGHT: (C)2008,JPO&INPIT
机译:要解决的问题:提供一种新的技术手段,以解决传统的顶起方法的问题,该方法用于构造过渡竖井和进行推进,并大大减少了工作量和成本负担,从而避免了工作执行中的麻烦和风险。解决方案:提供了一种过渡轴6的构造方法,用于将过渡轴6布置在起始轴和到达轴之间,以进行推进。根据该方法,将预先形成有孔61的钢制壳体62作为推进机7的输送口而压入地面,而不会将钢制壳体62内的土壤挖掘到当时所需的上覆土的水平。推进力。然后,使推进机7穿过在通过该方法构造的输送轴6中形成的输送口孔61,然后挖掘钢制壳体62中的土壤。版权所有:(C)2008,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号